Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2023 at 8:00 PM
Updated February 7, 2026
Renovation of a municipal facility in Pewee Valley, Kentucky. Completed plans call for the renovation of a municipal facility.
Estimated Length of Project: 150 (Substantial Completion) + 30 (Final Completion) Project Description: At KCIW's MSU dorm building, remove existing steam boiler and steam radiator system complete. Provide new packaged gas-electric rooftop units on grade with new supply and return ductwork to heat/cool the building. Provide new smoke control system for the building including exhaust fan, control dampers, smoke detectors, firefighter control station, and integration with building's existing central fire alarm system. Upgrade building's normal power electrical service to accommodate the new HVAC equipment. At the dayroom trailer, adjacent to MSU dorm building, remove two Bard window a/c units, and baseboard heaters. Provide new packaged gas-electric unit on grade and reconnect to existing supply and return ductwork. Although MSU Dorm & Dayroom are outside KCIW's main perimeter security fence, contractor is still subject to all of DOC/KCIW's contractor rules as outlined in the Special Conditions. Any questions during bidding period shall be submitted to the Engineer in writing. Contact is Connolly Consulting Engineers, Luke Powell, luke@cceky.com.
Bid Results
Municipal
$482,101.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 26, 2023
November 1, 2023
3000 Ash Ave, Pewee Valley, KY
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
