Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Lindenwold, New Jersey. Completed plans call for the renovation of a educational facility.
The project consists of the Partial HVAC systems replacement at the Lindenwold School #5 and the Lindenwold Middle School. The Work includes, but is not limited to, asbestos abatement, new vertical unit ventilators, DOAS units, new boilers/heating plant, new classroom shelving, wood laboratory demonstration tables, plastic-laminate clad casework with solid surfacing counters, maintenance re-painting, acoustical panel ceilings, lighting, and fire alarm system replacement. Construction shall begin on or about 01 May 2024 and shall be substantially completed on or before 23 August 2024 and all Punch List items completed by no later than 30 August 2024. This Project will be constructed with a phased construction schedule that includes after-hours work. Bidders are to refer to specification section 011000, SUMMARY, for phased construction information. Bidders who have received the bidding documents must submit substitution requests or any questions concerning the project to Regan Young England Butera on Section 006001 BIDDER REQUEST FOR INFORMATION included in the Project Manual no later than 1:00 PM on 26 June 2023. The Architect will not respond to questions received by those other than Prime Bidders. LINDENWOLD SCHOOL 5 550 CHEWS LANDING ROAD LINDENWOLD, NEW JERSEY 08021 CAMDEN COUNTY LOT 13.02/ BLOCK 240 NJDOE SP# 07-2670-090-23-1000 NJDOE LINDENWOLD MIDDLE SCHOOL 40 WHITE HORSE AVENUE LINDENWOLD, NEW JERSEY 08021 CAMDEN COUNTY LOT 2/BLOCK 145 SP# 07-2670-050-23-1000 Inquiries shall be directed to: Scott England, AIA REGAN YOUNG ENGLAND BUTERA, PC 456 High Street Mt. Holly, NJ 08060 (609) 265-2652/0333 Fax sce@ryebread.com 1. Phase 1: Boiler Room Demolition and Corridor Ceilings and Ceiling Grid Removal. a. Commencement of Construction: 1) After-Hours Work: Work under this phase may initiate at 3:00 P.M.-11:00 P.M., Mondays through Fridays. 2) Start Date: Work of this phase shall commence on or about 01 May 2024. 3) Lindenwold Middle School: The work may include the demolition of the heating plant in the Boiler Room and the demolition of the existing corridor ceilings and grid in Corridors D and D2 only. All life safety items, including but not limited to speakers, fire alarm system, IT equipment, and lights must be safely supported and remain in full function. 4) Lindenwold School #5: The work may include the demolition of the heating plant in the Boiler Room demolition of the existing corridor ceilings in Corridors 1, Corridor 2 and Corridor 3 only. All life safety items, including but not limited to speakers, fire alarm system, IT equipment, and lights must be safely supported and remain in full function. 5) At the end of each shift, the Contractor must fully clean the work areas, ensure all work is safe and prepare the space for students and staff to occupy the spaces the following day. 2. Phase 2: Owner's Removal of Equipment & Furnishings. a. Commencement of Construction: 1) Start Date: Work of this phase shall commence on or about 17 June 2024. 2) Completion Date: 20 June 2024. 3) The Work by the Owner's forces includes the removal of all ceiling-mounted projectors, Wi-Fi devices, IT equipment, and the removal of loose furniture from the work areas. 3. Phase 3: Asbestos Abatement Work. a. Commencement of Construction 1) Start Date: Work of this phase shall commence on or about 24 June 2024. 2) Lindenwold Middle School: The work may include the demolition of all existing classroom under-window shelving, instructor demonstration tables and limited asbestos floor tile and mastic abatement as referenced on the drawings and specifications. 3) Lindenwold School #5: The work may include the demolition of all existing classroom under-window shelving, and limited asbestos floor tile and mastic abatement as referenced on the drawings and specifications. 4) At the conclusion of the abatement and cleaning activities in each regulated work area where asbestos abatement is to be conducted, the Lindenwold School District's Environmental Consultant will perform final clearance air testing procedures. 5) No subsequent work can take place in any room where asbestos abatement work has been performed until the Lindenwold School District's Environmental Consultant issues a notice that the results of the air tests collected in the regulated work area in the room meet the regulatory standard for re-occupancy. Clearance will be given on a room-by-room basis. 4. Phase 4: Remainder of the Work: 1) Start Date: Work of this phase shall only commence after air clearance results and notification. 2) The Work: All remaining work required. 3) Testing and Balancing Reports: Compliant Testing and Balancing Reports must be submitted for approval by no later than 15 August 2024. 4) Substantial Completion: All work must be substantially complete by no later than 23 August 2024. 5) Punch List Completion: All Punch List work must be completed by no later than 30 August 2024
Award
Educational
$7,986,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2023
May 1, 2024
Multiple Locations, Lindenwold, NJ
Related To This Project
Lindenwold, NJ
Bid Date: Jul 12 2023
Lindenwold, NJ
Bid Date: Sep 19 2023
Lindenwold, NJ
Bid Date: Sep 13 2023
Lindenwold, NJ
Bid Date: Dec 07 2021
Lindenwold, NJ
Bid Date: Nov 16 2021
Lindenwold, NJ
Bid Date: Sep 12 2023
Lindenwold, NJ
--
Lindenwold, NJ
--
Lindenwold, NJ
Bid Date: Jun 08 2023
Lindenwold, NJ
Bid Date: Jun 22 2023
Lindenwold, NJ
Bid Date: May 11 2023
Lindenwold, NJ
Bid Date: May 02 2023
Lindenwold, NJ
Bid Date: May 02 2023
Lindenwold, NJ
Bid Date: May 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.