BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Tulsa, Oklahoma. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The TAIT seeks an experienced qualified firm(s) to provide all material, labor, supervision, tools, equipment, and incidentals necessary forthe Riverside Taxiway Connectors - Phase 2 Project. The project involves the modification of Taxiway A1, reconstruction/realignment of Taxiways A2, A3 and A4, and the construction of Taxiway H generally consisting of asphalt pavement construction (approximately 4,400 tons), and relocating and installing new lighting, markings, and signage. The project work area is shown in detail on the plans and includes, in general, Taxiway A, A1, A2, A3, A4 and H on the Tulsa Riverside Airport. Note that the project has two bid schedules. Schedule A is considered a Base Bid and will consist of all work including Taxiway A4. Schedule B is considered a Deductive Bid and will consist of all work excluding Taxiway A4. All bids must be accompanied by a certified or cashier's check, Bidder's Bond, or irrevocable letter of credit in the amount of not less than five percent (5%) of the bid, made payable to TAIT; and in the event TAIT shall award the contract to the bidder and the bidder shall fail, within fifteen (15) days from the making of such award, to enter into the contract and furnish the bonds and insurance as required, the amount of the certified check shall be retained by TAIT as liquidated damages; or, if a bid bond or letter of credit is submitted, the amount thereof shall then be immediately due and payable. Goals for minority participation for each trade: 10.2% Goals for female participation in each trade: 6.9% The TAIT reserves the right to reject any or all bids and to waive any minor technicalities in bidding. No bid may be withdrawn for a period of sixty (60) days after the opening thereof. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Budget is between $3 and $6 million Bid _ Results SCHEDULE A (INCLUDES TAXIWAY A4) APAC - Central, Inc. $4,865,000.00 SCHEDULE B (EXCLUDES TAXIWAY A4) APAC - Central, Inc. $4,000,000.00

Bid Results

Transportation Terminals

$8,865,000.00

Public - Federal

Paving, Site Work

101

8

2

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
60
Bidding Soon
669
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2023

July 27, 2023

img_map_placeholder

7777 Airport Dr, Tulsa, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.