Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a transportation facility in Brampton, Ontario. Completed plans call for the construction of a 460,000-square-foot, one-story above grade, 250-space transportation facility; and transportation facility.
The Construction Management Services contract will be executed in a Phased approach: Phase 1 for the design in which a Pre-Construction Services Agreement will be executed. Phase 2 for the potential early works and site development, and Phase 3 for the tendering, construction and post-construction, executing a CCDC 5B and the City's Supplementary Conditions. NOTE: Phase 2 is contingent on Steering Committee approval and Phase 3 is dependent on budget and Council approval. The Construction Manager shall have the ability, experience, equipment and financial stability to perform all construction tasks from initial consultation and design input, mobilization, construction, project handover and warranty periods. The City has received an estimated construction cost of $220-million (not including Cash Allowance or Contingencies) excluding HST for the construction of the new Transit facility, which includes General Expenses and Construction Manager's fee. The City of Brampton (the City) requires services from a construction management company (the Construction Manager) for the construction of the new Transit facility (the Facility), to be located near 10192 Highway 50 (Highway 50 and Cadetta Road), Brampton, ON. The City is seeking detailed Proposals from Construction Management companies interested in providing construction management services, including pre-construction and implementation of construction services, for the development of the new Transit facility in three development phases. The Facility is anticipated to be approximately 500,000 sq ft and will include an indoor garage to park 250, 40' Standard Bus Equivalents (SBE); a service and maintenance garage; and administrative support spaces. This Project is phase 1 of a multi-phased development; subsequent phases include future expansion to full capacity following the re-alignment of Rainbow Creek and the floodplain, and future full fleet electrification. Documents can be obtained at: https://brampton.bidsandtenders.ca The City of Brampton successfully secured $128.1 million in funding from the federal and provincial governments through the Investing in Canada Infrastructure Program (ICIP) towards the base (non-electrified) phase of the facility's construction, including up to $69.9 million from the Government of Canada and up to $58.2 million from the Government of Ontario. The City of Brampton is investing $154.8 million in city funding to complete the design and construction of Phase One. *Contract was awarded to Frontier Group of Companies as follows: $70,500.00 for Phase 1.
Award
Transportation Terminals
$220,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 9, 2024
November 1, 2024
10192 Hwy 50, Brampton, ON
Related To This Project
Brampton, ON
Bid Date: Mar 19 2024
Brampton, ON
Bid Date: Jun 27 2023
Brampton, ON
Bid Date: Jul 05 2023
Brampton, ON
Bid Date: Jul 05 2023
Brampton, ON
Bid Date: Jul 31 2023
Brampton, ON
Bid Date: Jul 07 2023
Brampton, ON
Bid Date: Jul 14 2023
Brampton, ON
Bid Date: Jun 21 2023
Brampton, ON
Bid Date: Jun 20 2023
Brampton, ON
Bid Date: Jul 12 2023
Brampton, ON
Bid Date: Jun 20 2023
Cemetery Gateway Features at St Mary's Anglican Cemetery and St. John's Snelgrove Cemetery - 5095991
Brampton, ON
Bid Date: Jun 15 2023
Brampton, ON
Bid Date: Jun 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.