Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2023 at 8:00 PM
Updated January 29, 2024
Demolition, site work, new construction and addition to a pre-engineered storage facility in Clam Lake Township, Michigan. Completed plans call for the addition of a pre-engineered storage facility; for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
Charter Township of Haring is accepting bids for an addition to the fire barn. The addition will be on the Northeast end of the existing building. The pole barn addition will be 30' wide, 40' long and 10' high with steel siding and roof to match existing building. Will also include: 2-3' x 6'8" service doors 1-9' High x 10' wide OHD 4-1' high x 3' long windows.
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$285,000.00
Public - City
Addition, Demolition, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2023
July 12, 2023
To Be Determined, Clam Lake Township, MI
Related To This Project
Clam Lake Township, MI
Bid Date: Sep 12 2023
Clam Lake Township, MI
Bid Date: Jan 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
