Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 6, 2023 at 7:00 PM

Updated January 27, 2024

Remodeling of a transportation facility in Chicago, Illinois. Completed plans call for the remodel of a transportation facility.

The AECOM/Hunt, Clayco and Bowa (AHCB) team has been tasked with the TAP Enabling Critical Path Scope Projects. The project scope of work will eliminate the Central Detention Basin while expanding the South Detention Basin, which are both required in order to commence construction of the Terminal Area Plan (TAP) Satellite #1 and #2 Concourses. Prequalification required for Bid will be received by AECOM/Hunt Clayco, a Joint Venture comprised of AECOM/Hunt, Clayco and Bowa (AHCB) for the specific bid and trade package(s) listed below. Note: Sub Tier Subcontractors and Suppliers need not prequalify. Advertisement Date: Sunday, September 10 & 17, 2023 Bid Release Date: Thursday, October 5, 2023 Pre-Bid Conference: Thursday, October 12, 2023 Bid Package 02 - TAP Enabling Critical Path Scope Projects Trade Package 05 - Basin Improvements and Taxiway Paving This project is comprised of two (2) components located within the Airport Operations Area (AOA). The first component is work associated with the Central Detention Basin. This scope includes the embankment of approximately 250K CU YD of lime modified earthen materials, preparation of the temporary taxiway subgrade, and paving of a new bituminous (flexible pavement section) taxiway approximately 300-ft wide and 1000-ft long. Temporary taxiway improvements further include installation of drainage systems, airfield electrical, taxiway markings, and airfield signage. The second component is work associated with the South Detention Basin. This scope includes the excavation of approximately 260K CU YD of earthen materials, to be embanked in the Central Detention Basin, associated infrastructure improvements, and restoration for a westward expansion of the South Detention Basin. Trade package descriptions can also be found online at both ahcjv.com/projects/#Basins and https://www.ord21.com/bids/. The Prequalification Questionnaire is available only at https://ahcjv.com/bidding-registration/. For additional information, contact: Email: basins@AHCJV.com. Prequalification Documents Due By: December 5, 2023 Mark all inquiries: "TAP Enabling Critical Path Scope Projects at O'Hare International Airport - Trade Package 5" in the Subject Line. For info on how to participate as a Sub Tier Subcontractor, Supplier, Medium Business Enterprise or Small Business Enterprise, please visit www.AHCJV.com. To view other bids with the City of Chicago Department of Aviation go to: http://www.flychicago.com/business/opportunities/bidscontracts/pages/default.aspx

Post-Bid

Transportation Terminals

$2,500,000.00

Public - Federal

Remodeling

318

100

116

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
557
Active Projects
227
Bidding Soon
4,132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2023

September 2, 2024

Project location map

10000 W Balmoral Ave, Chicago, IL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed