BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Charleston, South Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Road Work - Sanders Road and Halfshell Lane Sidewalk Project CTC - The project shall consist of constructing a permeable pavement sidewalk on Sanders Road to connect to the existing sidewalk at Halfshell Lane to the existing sidewalk. The project, located in Charleston County, shall consist of constructing a permeable asphalt pavement sidewalk on Sanders Road to connect the existing sidewalk at Halfshell Lane to the existing sidewalk at C.E. Williams School. The work shall include, but is not limited to, ditch excavation, sidewalk underdrain installation, raised crosswalk installation and striping. The project will be constructed utilizing the items listed on the bid tab form in the solicitation. Questions Due Date: Mar 29th 2024, 5:00 PM EDT 5% minority and 5% woman-owned business enterprise substantially completed -(240) calendar days; final completion (30) calendar days after substantial completion date.

Bid Results

Sidewalks / Parking Lot

$412,005.00

Public - County

Paving, Site Work

16

5

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
81
Bidding Soon
914
All Active Projects
424
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 16, 2024

June 17, 2024

March 14, 2025

img_map_placeholder

Sanders Road and Halfshell Lane, Charleston, SC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.