BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Memphis, Michigan. Completed plans call for site work for a water / sewer project.

**As of August 17, 2023, this project has not yet been awarded.Award is anticipated the end of the month or the beginning of next month to Northern Pump..** The work includes providing and installing approx. 78 cubic feet of new filter media at each of the 3 existing vessels to remove arsenic and iron. Existing media to be removed tested and disposed of appropriately. Testing of the new media for acceptance prior to recommissioning into service is required. Contract 1 - New Water Mains on Robert & Lois St & Lead Service Line Replacements includes replacement of approx. 1450 feet of watermain on Robert and Lois Street including associated HMA replacement, sidewalk removal and replacement, lawn restoration with other appurtenances. Also included is the replacement of approx. 45 lead service lines on Roberts & Lois Street and throughout the City via open cut and directional drilling. Sidewalk removal and replacement, and lawn restoration with other appurtenances will be needed for lead service line replacement scope. Contract 2 -Water Main Replacements includes providing and installing water meters in the quantity and sizes specified while coordinating all work with the City and City Customers. Contract 3 - New Gas Generator includes providing and installing a new gas generator and transfer switch on a new concrete pad. Also included is new electrical, gas, and utility service work and contractor work with other appurtenances. Contract 4 - Filter Media Replacement includes providing and installing approx. 78 cubic feet of new filter media at each of the 3 existing vessels to remove arsenic and iron. Existing media to be removed, tested and disposed of appropriately. Testing of the new media for acceptance prior to recommissioning into service is required. Contract 5 - Well Pump Replacements includes removing existing well pumps and providing and installing 3 new well pumps matching existing pump performance. Also included is pipe rework to accommodate new pumps and other appurtenances.

Bid Results

Water / Sewer

$204,614.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
69
Bidding Soon
1,173
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2023

October 18, 2023

img_map_placeholder

81631 Belle River Rd, Memphis, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.