BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a mixed-use development in Madison, Wisconsin. Completed plans call for the demolition of a three-unit residential development; and for the construction of a 149,200-square-foot, six-story above grade educational facility.

Plans call for the demolition of 3 residences and the construction of a new 6 story academic building. As of November 3, 2023, this project out to bid and bids are due November 8th at 2 p.m. An architect has been selected. Construction is anticipated to start in January 2024 and be completed by April 2026. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. In general the work consists of a new six story, plus mechanical penthouse, 142,694 GSF academic building. This project creates a new unified home for eight departments, programs, and centers (collectively called Units) within the College of Letters and Science by consolidating and co-locating spaces currently spread across multiple facilities on campus. The proposed building will include 13 classrooms ranging from 24 seats to 426 seats, along with offices and support areas for each Unit. In addition, there will be a variety of academic support spaces, informal gathering spaces, a cafe, bike commuter room, rooftop mechanical penthouse, and Ground Floor level raised loading dock. The building is organized around a central grand stair and a series of two-story voids stepping up through the building to a Fourth Floor exterior two-story high outdoor terrace. The sloping site will provide grade-level access on the south to the Ground Floor and on the north to the First Floor. Levy Hall is the first project of the campus Master Plan objective to develop the entire block bounded by Johnson (north), Park (east), Dayton (south), and Brooks (west) Streets. The block is bisected by Clymer Court running between Park Street and Brooks Street. Two residence halls (Susan B. Davis Hall and Zoe Bayliss Co-Op), along with a single-family residence at the corner of Johnson and Brooks Streets, will be demolished as part of the project to make space for Levy Hall. In addition, three residences south of Clymer Court will be demolished under a separate contract just after commencement of this project to provide limited staging and lay-down space for this project. The new facility will be a poured-in-place concrete structure with selected post-tensioned beams. Cladding will be brick, architectural precast panels, aluminum curtain wall, and aluminum storefront. The roof will be fully-adhered EPDM, but will be hot fluid applied at a series of vegetated roofs. The mechanical penthouse will be clad with metal panels. Interior partitions are primarily metal studs and drywall with solid core wood doors in hollow metal frames. Floors are primarily epoxy terrazzo, carpet, polished concrete topping, and porcelain tile; ceilings are primarily acoustical panel lay-in, drywall, acoustical plaster, and exposed structure. Systems include two 4,000-lb passenger traction elevators, public water, storm, sanitary, and electrical; campus chilled water, steam, and signal; stormwater irrigation cistern, and 2,600 square feet of rooftop photovoltaic panels. The two largest classrooms will have tiered floors with underfloor dispersion air distribution. The facility will also house a 250-kW natural gas emergency generator

Award

Educational

$75,954,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

526

49

107

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
64
Bidding Soon
2,063
All Active Projects
663
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.