BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lemoore, California. Working plans call for site work for a water / sewer project.

**As of October 20, 2023, bids received were rejected. Project will rebid but no definite date yet.** Question Deadline 07/04/2023 All questions regarding this project during the bidding phase shall be submitted in writing to Stephanie Hermeston, at Stephanie.Hermeston@qkinc.com. Questions are due no later than 7-days prior to bid opening. The Work to be performed under this Contract as described below shall consist of furnishing all materials, equipment, supplies, labor and transportation, and performing all Work as required by and in strict accordance with the Contract Documents, all of which are made a part hereof. The Work shall be complete, including all Work, material, and services not expressly called for or shown in said Contract Documents, which may be necessary for completion and proper construction to carry out the Contract in good faith. The site of Work shall be left in a neat condition. The cost of all Work performed, furnished, and installed is to be included in the amount bid for the various items of Work with no separate compensation allowed therefore. All Work shall be performed in accordance with the applicable portions of the latest revisions of the City Standard Specifications and Standard Drawings; and any other plans or specifications indicated in the Contract Documents. The scope of Work is outlined in the Contract Documents, including but not limited to the Plans and Contract Specifications. furnishing all labor, materials, services and equipment, and performing all work necessary as specified for, but not limited to, installation of new sanitary sewer trunklines, installation of a new lift station and associated improvements including furnishing and installation of new wet well, new pumps, level sensor, control panel and associated electrical improvements, as the Lemoore Sanitary Sewer Lift Station 9.

Final Planning

Water / Sewer

$4,929,632.00

Public - City

Site Work

29

18

40

9

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
21
Bidding Soon
445
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

April 19, 2024

img_map_placeholder

San Simeon Dr & Carmel Dr, Lemoore, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.