Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a residential development in Newark, New York. Completed plans call for the renovation of a residential development.
The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be started within 60 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of project before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. Any questions not asked at the site visit must be submitted in writing to FL.Purchasing@opwdd.ny.gov within 2 business of the site visit. Contractors will receive a response within 2 business days after the deadline for submitting questions. All questions and answers will be e-mailed to all contractors that attended the mandatory site visit. Service-Disabled Veteran-Owned Set Aside: No Contract term: 30 days after completion of project County(ies): Wayne 1. Price quote shall include all materials (GWB, paint, stain, necessary tools and accessories) and labor. 2. Remove the FRP that is laminated to the walls. 3. Install National Gypsum High Impact 5/8" type XP wall board over the existing GWB using liberal adhesive and 2-inch screws driven into the studs 4. "J" Channel will be necessary where the termination of the drywall does not butt to a wall or jamb cleanly. 5. The connection to the ceiling may be finished with 230 paintable caulk. There will not be any gaps, cracks or holes in these assemblies or their connections to the rest of the home. 6. Finish the drywall with spackle and tape according to manufacturer's specifications. 7. Paint, stain and other finishes must be a SHERWIN WILLIAMS product selected from the DDSO neutral colors list 8. Paint used on walls and trim must be a semi-gloss finish. 9. A clear satin low VOC coating to be applied to all-Natural Wood trim and doors if needed. 10. Any stains shall be primed, with a satin killing primer to prevent bleed-through of topcoat. 11. All surfaces shall have two (2) coats of paint minimum (prime and paint); three (3) or more if necessary, for complete coverage, same for varnish's if applicable. 12. Apply paints and stains by brush and roller only, per the manufacturer's written instructions. Use primer as recommended by manufacturer. 13. Use drop cloths to cover stationary furniture, flooring, appliances, etc. 14. See attached floor plan for work that needs to be addressed on a room-to-room basis. 15. Sprinkler heads, fire alarm pull stations, smoke detectors, and heat detectors must be free of any paint when the job is complete. 16. Remove and dispose of any empty cans, rags, rubbish, masking and other rubbish materials at the end of each workday. Debris will be removed from the jobsite by the contractor and disposed of properly 17. Clean glass and paint spattered surfaces by scraping and washing Final Date for Receipt of Questions: September 7, 2023
Bid Results
Residential Subdivision
$31,750.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2023
October 13, 2023
108 Cobblestone Terrace, Newark, NY
Related To This Project
Newark, NY
Bid Date: Dec 14 2017
Newark, NY
Bid Date: Sep 28 2023
Newark, NY
Bid Date: Aug 24 2023
Newark, NY
Bid Date: Sep 12 2023
Newark, NY
Bid Date: Nov 28 2023
Newark, NY
Bid Date: Sep 27 2023
Newark, NY
--
Newark, NY
Bid Date: Jun 28 2023
Newark, NY
--
Newark, NY
Bid Date: Jun 06 2023
Newark, NY
Bid Date: May 18 2023
Newark, NY
Bid Date: May 02 2023
Newark, NY
Bid Date: May 02 2023
Newark, NY
Bid Date: May 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.