BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2023 at 8:00 PM

Updated October 17, 2024

Renovation of an educational facility in Bellflower, California. Completed plans call for the renovation of a primary / secondary education facility.

o REMOVAL AND DISPOSAL OF THE EXISTING PLAY STRUCTURES. o REMOVAL OF THE EXISTING WOOD CUSHION PLAYFALL MATERIAL TO AN APPROXIMATE DEPTH OF 6" AND DISPOSAL. DIMENSIONS AND SQUARE FOOTAGE HAS BEEN PROVIDED. o GRADING AND COMPACTION OF THE EXISTING SOIL BASE SURFACE WITH NEW SUB BASE MATERIAL o NEW APPLIED RUBBER SURFACING PER SPECIFICATIONS. CONTACT THE GAMETIME REPRESENTATIVE FOR PRICING OF THE SURFACING MATERIAL. o NEW PLAYGROUND STRUCTURES PER SPECIFICATIONS. MODEL NUMBERS HAVE BEEN PROVIDED ALONG WITH THE GAMETIME REPRESENTATIVE FOR PRICING. o INSTALLATION OF EXTREME FLEXGROUT IN THE HIGH WEARING AREA AS SHOWN ON THE SITE DRAWINGS The last day to submit question(s) for this Project is July 5, 2023 by 3:30 P.M. and should be emailed to: purchasingservices@busd.k12.ca.us

Award

Educational

$6,500,000.00

Public - City

Renovation

16

4

12

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
209
Bidding Soon
3,836
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.