Published August 15, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Iola, Kansas. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Cost Estimate: $400,000-$425,000 The general scope of work includes removal of the playground equipment and surfacing, base preparation, new concrete slabs and walks, new rubber play surfacing and new playground equipment, and other items as specified for a complete and working installation The Contractor agrees that time is of the essence in the completion of the work required by this Contract, for which completion is established on or before Ninety ( 90 ) calendar days, following receipt of the "Notice to Proceed" and Contractor hereby waives any notice putting in default for failure to complete on time. Liquidated Damages. It is agreed that for every calendar day that the contract exceeds Ninety ( 90 ) calendar days, the Contractor will be assessed a deduction against the Contract amount at $100.00 per calendar day, as a liquidated damage fee and not as a penalty. Extensions may be granted by the Authority, as outlined in the General Conditions. a) General Construction i) Please see the attached plans and technical specifications to determine the full scope of work. ii) The general scope includes (1) demolition of the (3) existing playgrounds at these two sites. This includes the equipment, borders and surfacing. (2) Preparation and compaction of the subgrade. (3) Placement of new concrete playground bases at each site. (4) Installation of new playground equipment and play surfacing as selected by the Owner. 2023 CFP Playground Modernizations at the 49-02 Sites, for the Iola H.A. Page 2 of 2 (5) New sidewalks, benches and site improvements as noted (6) Yard repairs, finish grading and seeding of damaged areas in the work zone. iii) The Contractor is responsible for daily cleanup of the work areas, and for hauling these items off for disposal off site. iv) After the original contract has been awarded, additional work may be identified by the Owner and the successful contractor. Additional work will be done by a change order. v) All work shall be completed in compliance with these contract documents vi) Weekly certified payroll reports (CPR's) shall be completed and submitted to the Owner for review. Any questions regarding the RFP should be directed to Richard Zingre, Project Architect at Zingre and Associates, PA. rzingre@gmail.com or 620-223-6030 voice. . The Owner requests that proposals are received by the end of the day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$358,215.00

Public - City

Paving, Site Work

6

8

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
28
Bidding Soon
398
All Active Projects
188
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

August 12, 2023

img_map_placeholder

Multiple Locations, Iola, KS

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Playground Modernizations at the 49-02 Site

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.