BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tahlequah, Oklahoma. Completed plans call for site work for a water / sewer project.

Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidders responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment B Including But Not Limited To: 1) Demolition and removal of existing air handler from campus 2) Demolition should include all water piping, electrical, control wiring, and ductwork that is in the way of unit removal 3) Bidder responsible for repairing damages caused by bidder. 4) Bidder is responsible for getting new, owner provided, unit inside of the building. 5) Installation of new owner provided unit 6) Re-pipe chilled and heating water to new unit 7) Insulate all new piping 8) Reconnection/Build-Out of existing trunk duct lines to new unit 9) Reconnection/Build-Out of return air duct to the new unit 10) Reconnection of power from VFD to new unit 11) Reconnection of Control wiring 12) Reconnection of condensation piping 13) Bidder is responsible for start-up of new unit 14) Bidder should check operation of new unit as part of job completion 15) NSU is a Tobacco Free campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 16) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections. Contractor shall provide NSU with documentation of compliance at completion of work. 17) Contractor to be responsible for all permits and fees associated with this scope of work. 18) Work may be halted and resumed at any given time according to NSUs needs. 19) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 20) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours notice prior to any utility outages/shut-offs. 21) Contractor shall be responsible for coordinating any and all utility locations for the project. 22) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 23) Contractor is responsible for all field verifications of dimensions and conditions. 24) NSU will provide information on electrical panel locations and available power from each location. 25) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in contractor provided trash receptacle. 26) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 27) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 28) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 29) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 72 hours prior to the bid closing date. 30) Contractor shall be responsible for demolition, removal, loading and haul off of all materials, scraps and debris. 31) Contractor shall be responsible for repairing rutted or furrowed greenspace, by means of fill dirt and sod, as deemed necessary by the owner. 32) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 33) Contractor shall not interfere with building exits or egress paths of any occupied buildings. 34) Contractor shall maintain a site supervisor at all times when the contractor has a presence on campus. 35) Contractor shall be responsible for Final Cleaning. This will be to the Owners discretion. 36) Contractor shall be responsible for and acknowledge all plans, specifications, and details as shown in all bidding documents.

Award

Water / Sewer

$49,850.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
56
Bidding Soon
769
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2023

August 7, 2023

img_map_placeholder

717 N Grand Ave, Tahlequah, OK

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.