BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Mobile, Alabama. Completed plans call for site work for a water / sewer project.

https://www.wkrg.com/mobile-county/dauphin-island-causeway-restoration-project-set-to-begin-this-fall/ MOBILE COUNTY, Ala. (WKRG) — The Mobile County Commission approved a contract Monday morning to begin construction for the Dauphin Island Causeway Restoration Project, according to a release from the county. According to the release, the project is set to begin this fall and finish in summer 2024. READ NEXT: The latest Alabama headlines from WKRG News 5 The project is in place to “restore tidal habitat along the 3.3-mile stretch of Dauphin Island Causeway (SR 193) from Mobile County’s Bayfront Park to Cedar Point,” the release reads. The project’s funding comes entirely from grants from the National Fish and Wilflife Foundation, Emergency Coastal Resilience Fund and the Gulf Environmental Benefit Fund, which the county commission approved in May 2021. According to the release, Carter Contracting Services, Inc. will lead the project after a “low bid of $26,685,698.” “We’re delighted to see work begin on what is the largest and most significant investment in an Alabama coastal restoration project,” District 3 Commissioner Randall Dueitt said. “This is a fitting use of oil spill dollars because restoring the shoreline to historic proportions using modern engineering techniques will protect an important roadway and important habitats.” ---------------------------------------------------------------------------------------------------------------------------- The Dauphin Island Causeway Shoreline Restoration: Phase 1 project consists of the first phase of a living shoreline to provide habitat restoration and shoreline protection along the Mobile Bay Shoreline adjacent to Dauphin Island Causeway. The first phase includes excavation of approach and access channels in Mobile Bay and the construction of offshore graded rock riprap breakwaters. Subsequent project phases will place dredged material behind the breakwaters to restore marsh and shoreline habitats. 225 calendar days are allowed for the construction of the project. Please be advised that all questions or comments for the above subject project will be accepted in writing only via email. All questions or comments must be received in this office by 5:00 P.M. one week prior to the bid date. You can email comments and questions to khanegan@moffattnichol.com. Appropriate responses will be issued only to those items considered necessary by Moffatt & Nichol via an addendum. A cashier's check drawn on an Alabama bank or a bidder's bond, payable to Mobile County, Alabama, for an amount not less than five percent (5%) of the amount bid, but in no event more than ten thousand dollars ($10,000.00), shall be filed with the bid, as a bid guaranty. The bidder's bond shall be prepared on the form specified and issued by a surety company authorized to do business in the State of Alabama. A performance bond in the form and terms approved by the County in an amount not less than the contract price will be required at the signing of the contract. A labor and materials bond in the form and terms approved by the County in an amount not less than the contract price, insuring payment for all labor and materials, shall also be required at the signing of the contract. Liquidated damages for non-completion of the work within the time limit agreed upon will be assessed in accordance with the terms of the contract.

Bid Results

Water / Sewer

$26,685,699.00

Public - City

Site Work

123

27

16

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
38
Bidding Soon
491
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2023

August 18, 2023

img_map_placeholder

To Be Determined, Mobile, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.