BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Elkins Park, Pennsylvania. Completed plans call for the renovation of a educational facility.

Supervision, dumpsters, trash removal, daily cleanup, taxes and fees Remove and dispose of existing ceiling tile Remove and dispose of existing 2x4 light fixtures Furnish and install USG 2310 2x4 ceiling tile Install approximately (108) SYLVANIA 62699 PANELF3BS045UNVD8SC724GWHTAA owner provided LED 2x4 light fixtures. The new lights will be tied up to the decking with existing ceiling safety wires from the old fixtures being removed. Remove and reinstall all speakers and smoke heads. All security devices will be handled by in house staff working along with contractor. All ceiling grid is to remain as-is. All work will be conducted during summer break and MUST be completed prior to the beginning on the 2023-2024 school year

Award

Educational

$83,424.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
938
Active Projects
428
Bidding Soon
6,914
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.