BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Wahpeton, North Dakota. Completed plans call for the renovation of a municipal facility.

Project consists of renovating the HVAC of the 24,600 SF Richland County Courthouse. Sealed bids for the following bid group packages of construction for the above referenced project will be received by Richland County until Tuesday June 27th, 2023 at 10:00 AM local time at the Richland County Courthouse, 418 2nd Ave North, Wahpeton, ND 58075, in the Commission Room at which time bids will be publicly opened and read aloud. Sealed bids may also be delivered to the office of Comstock Construction, Inc. 280 South 11th Street, Wahpeton, nd 58075 until June 26th, 2023 at 5:00 pm, after which, bids will only be accepted if delivered to richland county courthouse.Bid Packages: 01A Final Cleaning 02A Building Demolition 06A Finish Carpentry 07A Roofing (Alternate No. A-02) 08A Openings 08B Glazing 09A Gypsum Wallboard & Light Metal Framing 09B Acoustical Ceilings 09C Painting 22A Plumbing 23A Heating, Ventilation and Air-Conditioning (HVAC) 26A Electrical. All bidders are required to submit bids for a complete bid package described in section 00 31 00 - Bid Package Descriptions on the bid form provided in section 00 41 00 - Bid Form in the project specifications. All bidders are required to include applicable state and local taxes in their bid. Each sealed bid shall be accompanied by bid Security in the form of a certified check, cashiers check, or a bidder's bond in a sum equal to 5% of the full amount of the bid made payable to the owner. Each bidder shall be prepared upon bid acceptance and contract award, within ten days after notice of award, to effect and execute a contract in accordance with the term of these specifications. Comstock Construction, Inc. and Richland County reserve the right to reject any and/or all bids received and to waive any informalities and irregularities in the bidding. No bid will be read or considered which does not acknowledge project addendums or fully comply with the above referenced provisions, and any deficient bid submitted will be resealed and returned to the bidder. Bids may not be withdrawn or modified within thirty (30) days after the closing time and date. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to July 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Post-Bid

Municipal

$500,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
103
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2023

July 27, 2023

img_map_placeholder

418 2nd Ave N, Wahpeton, ND

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.