Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Charlottesville, Virginia. Contact the soliciting agency for additional information.
The University of Virginia (University or UVA) invites highly qualified Architectural/ Engineering (A/E) firms to submit a Letter of Interest/Statement of Qualifications and associated supporting materials for consideration in the selection of a consultant team to provide programming, planning, architectural, and engineering design services for the design and construction of the Fontaine Data Center at UVA's Fontaine Research Park (Fontaine), in accordance with the latest version of the UVA Higher Education Capital Outlay Manual (HECOM). The first phase of the project will be pre-design. Upon successful completion of the pre-design effort, the University may in its sole discretion elect to retain the selected firm for full design and construction services for any or all phases of the future project. Purpose and Program Background: In 2022, the University charged the High Performance Computing Infrastructure Committee (HPC-IC) to project research computing needs and the infrastructure necessary to support those needs over the next 5-10 years. The HPC-IC had considerable conversation about the importance of a solid, leading edge HPC infrastructure. It serves as the foundation for a robust research program, aligns us with our peers, and enables us to become competitive both for the faculty we can recruit and the research we can perform. The committee looked at many options to expand the existing data center capacity to meet the growth needs and recommended a new data center in the Fontaine Research Park with the expectation that it will be operational in 2026. Project Drivers: The University currently operates 2 data centers, the University Data Center (UDC), which opened in 2011, and the Carruthers Data Center (remodeled in 2014). Both facilities provide back-up power capabilities and air-cooled racks, which have reasonable power and cooling for historica land current data center needs. Given the current growth of HPC, the UDC is expected to reach its UPS (Uninterruptable Power Supply) and cooling capacity in 2024. In addition to capacity constraints, the UDC in its current design will not support the more modern, higher power rack density for newer HPC machines. The proposed new facility is assumed to have an initial capacity of 8MW with future expansion to 16MW with Tier II resiliency. In addition, the building and associated infrastructure shall: Ensure that appropriate information security and regulatory compliance requirements are met. Consider University sustainability goals and how synergies may be exploited. Be cost effective, both initial capital or up-front costs as well as lifecycle maintenance, update of hardware, and leasing/ licensing costs. All questions should be directed ONLY to Bruce Jackson at 434-924-6387 or brj2n@virginia.edu
Conceptual
Educational
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2024
Multiple Locations, Charlottesville, VA
Related To This Project
Charlottesville, VA
Bid Date: Jul 20 2023
Charlottesville, VA
Bid Date: Jul 28 2023
Charlottesville, VA
--
Charlottesville, VA
--
Charlottesville, VA
--
Charlottesville, VA
Bid Date: Jul 26 2023
Charlottesville, VA
--
Charlottesville, VA
Bid Date: Jul 12 2023
Charlottesville, VA
Bid Date: Jun 20 2023
Charlottesville, VA
Bid Date: Jul 12 2023
Charlottesville, VA
Bid Date: Jun 12 2023
Charlottesville, VA
Bid Date: Jun 30 2023
Charlottesville, VA
Bid Date: Jul 11 2023
Charlottesville, VA
Bid Date: Jul 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.