BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Naperville, Illinois. Completed plans call for site work for a bridge / tunnel.

All questions concerning this project or those concerning bidding requirements should be directed to Allan Barajas in writing to abarajas@napervilleparks.org. Questions will be received in writing only through June 23rd, 2023. Requirements for Performance and Bid Bonds 1. A bid bond is not required for this project. 2. If a bid is accepted, a Labor & Material Payment Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction. A Performance Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction on all projects $50,000 or more, and may be required for projects $50,000 or less at the discretion of the Naperville Park District. Such bonds shall include the provision guaranteeing the faithful performance of the Prevailing Wage Act. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. 3. If a bid is accepted, the Contractor will be required to file a written substance abuse prevention program with the Owner for the prevention of substance abuse among its employees prior to the commencement of the work. Said program shall be available to the general public. Award of Contract It is anticipated that the contract will be awarded in July. The Park District reserves the right to reject any non-responsive or non-responsible Bids or to reject all bids and waive any informality or technicality in any Bid in the interest of the Park District. The scope of work includes renovation of a pedestrian bridge with welded installation of steel rails, removal of wood decking and replacement with wood decking or steel bar grating.

Award

Bridges / Tunnels

$73,735.00

Public - City

Site Work

9

13

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
89
Bidding Soon
1,735
All Active Projects
763
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2023

July 31, 2023

img_map_placeholder

336 Knoch Knolls Rd, Naperville, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.