BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Estacada, Oregon. Completed plans call for the renovation of a educational facility.

The Estacada School District 108 is seeking proposals from firms for the architectural, structural, mechanical and electrical design for the Seismic Rehabilitation of the Estacada High School Gym (the"Project"), located at 355 NE 6th St, Estacada, Oregon 97023. The building structure was built in 1962. In 2023, the District applied for and received a Seismic Rehabilitation Grant ("SRG") for the Project through the Infrastructure Finance Authority: Business Oregon, based on the application prepared by WRK Engineering, Inc. The intent of this RFP is for the consultant to provide an integrated design solution for the entire building. As part of this grant, a preliminary rehabilitation feasibility report was prepared for each portion of the project and is enclosed. The District was awarded $2,498,000 for the design and construction of the Estacada High School Gym Seismic Rehabilitation, with $3,319,753 of that amount allocated to architectural and engineering services; $69,946 to construction management and $1,743,569 to construction costs. Construction Budget: The construction budget shall not exceed $1,898,600.00. Question Deadline 01/10/2024 at 5:00 PM PT Questions and comments pertaining to this solicitation must be submitted in writing according to the Proposal and Award Timeline to: For technical questions / clarifications: Brian Knight, WRK Engineers, Inc. brian@wkrengrs.com For Questions regarding the RFP process: Brian Knight, WRK Engineers, Inc. brian@wkrengrs.com The District intends to use the CM/GC procurement project delivery method for this Project. Pre-Design/Schematic Design would begin immediately upon award and approval of the resulting design contract. Construction is anticipated to start on June 21, 2024, with the Project completion expected by August 23, 2024. The Project may be vacated during the construction period. As of September 18, 2023 a design team has been identified.

Post-Bid

Educational

$2,498,072.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
566
All Active Projects
273
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2024

June 16, 2025

img_map_placeholder

355 NE 6th Ave, Estacada, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.