BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Auburn, Iowa. Completed plans call for the renovation of a water / sewer project.

Construct Water Treatment Plant Filter Replacement including all materials, labor and equipment necessary for removal of two existing vertical pressure filters and the installation of two new vertical pressure filters in the water treatment plant and miscellaneous associated work, including cleanup. The project is located at the Auburn Water Treatment Plant at Third Street and Spruce Street in Auburn, Iowa. Each bid shall be made out on a blank form furnished by the City and must be accompanied in a sealed envelope by bid security in the form of a certified or cashier's check, drawn on a state-chartered or federally chartered bank; or a certified share draft drawn on a state-chartered or federally chartered credit union in an amount equal to 10% of the bid; or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 10% of the bid. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall protect and save harmless the City from claims and damages of any kind caused by the operation of the Contractor and shall also guarantee the maintenance of the improvements for a period of two (2) years from and after completion and acceptance by the City. The work shall commence within ten (10) calendar days after the date set forth in written Notice to Proceed. The work shall be completed within three hundred (300) consecutive calendar days. Liquidated damages in the amount of Two Hundred Fifty Dollars ($250.00) per calendar day will be assessed for each day that the work shall remain uncompleted after the end of each of the contract periods, with due allowance for extensions of the contract periods due to conditions beyond the control of the Contractor. The City reserves the right to reject any and all bids, to waive informalities or technicalities and to enter into such contract as it shall deem to be to the best interests of the City. The City will award contract on the basis of the lowest responsive and responsible bid.

Post-Bid

Water / Sewer

$354,200.00

Public - City

Renovation

12

18

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
49
Bidding Soon
680
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

October 2, 2023

img_map_placeholder

Multiple Locations, Auburn, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.