BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hilton Head Island, South Carolina. Completed plans call for site work for a water / sewer project.

PROPOSED WORK: The proposed work consists of restoring navigation in the entrance of Park Creek and renourishing an erosional isthmus shoreline. In detail, the applicant proposes to excavate material from the mouth of Park Creek to restore inlet navigation and flushing through the marsh creek system. The excavated sandy beach compatible material will be beneficially used and placed approximately 2,100 ft east along an erosional section of Port Royal Sound estuarine shoreline between the Dolphin Head Recreational Area (also referred to as Dolphin Head Park) and Pine Island (also referred to as the Pine Island isthmus). The applicant proposes to excavate the sedimentation area to a depth of -6 ft NAVD (+/- 1 ft) with a cut side slope of 1:3 (V:H). Dredge cuts will range from ~50 ft to 250 ft in width by excavating the northeast side of the channel including the accretional material on the west end of Pine Island, restoring the entrance channel for advanced channel maintenance and to mitigate future sedimentation. All excavation and sediment activities will be waterward of the existing marsh vegetation. The sandy beach compatible material will be placed on the Pine Island isthmus to create a berm crest height of +5.5 ft NAVD. The constructed berm will be ~115 ft wide and follow a 1:10 slope down to the existing grade landward of the berm. The project is estimated to take 2-6 months to complete. Typical land-based heavy equipment (e.g., long reach excavator, track-hoes, dump trucks) will be used. Access to the site will either come from barge or through the Dolphin Head Recreation Area. A long reach excavator will be used to remove sand from the mouth of Park Creek and be placed into an offroad dump truck. The truck will drive the designated construction path to the north end of the island and place the compatible sand. A bulldozer or bobcat will be used to shape the fill into the correct template. In total, the project involved the dredging/ excavation of 28,500 cubic yards of material from 4.97 acres to be placed within a 4.76-acre area.

Post-Bid

Water / Sewer

$100,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
38
Bidding Soon
524
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2023

September 13, 2023

img_map_placeholder

15 Surrey Ln, Hilton Head Island, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.