BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Freeport, Maine. Contact the soliciting agency for additional information.

The Freeport Sewer District (District) is seeking qualifications immediately for the provision of Wastewater Engineering Services for the upgrade of its Wastewater Treatment Facilities and Collection System. The work required may involve, but is not limited to, engineering services related to the wastewater treatment facility, collection system, pump stations, and asset management of wastewater infrastructure. The contract shall begin on or about August 7, 2023. The District owns and operates a 0.75 million gallons per day (MGD) wastewater treatment facility (WWTF) located on South Freeport Road. The District also owns and operates gravity sewers, pump stations and force mains to convey the Town's wastewater to the WWTF. The treated effluent from the WWTF is discharged into the Harraseeket River. The WWTF consists of three package treatment plants in parallel that provide for aeration, clarification, and sludge digestion. Screening of influent wastewater is performed upstream of the package plants and chlorine disinfection is performed downstream prior to discharge. Since 2012, the plant has undergone some upgrades consisting of new aeration blowers, new sludge pumps, a new dewatering system, and a SCADA system upgrade. The District has conducted both a Fiscal Sustainability Plan dated May 2022 and a Preliminary Engineering Report and Environmental Assessment dated March 2023 in order to identify the work required to upgrade the existing WWTF and Collection System. They have also secured a loan/grant from Rural Development/USDA in the amount of $20,132,000 and have submitted a Congressionally Directed Spending Request for $2,886,000 that will bring the total Project Cost up to $23,018,000. All questions should be directed, in writing, to Leland Arris, General Manager ( fsdla1@gmail.com ) or Jon McCabe, Superintendent ( fsdjon1182@gmail.com ) and must be received by the end of the day on June 26, 2023. Questions received after this time will not be addressed.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
23
Bidding Soon
527
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2023

July 2, 2024

img_map_placeholder

S Freeport Rd, Freeport, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.