Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Maple Lake, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
For the furnishing of all labor, materials, and all else necessary for the following: 2023 Mill & Overlay In general and pursuant to Minnesota Statutes, chapter 429, the work consists of the construction of storm sewer improvements and street construction with approximately the following quantities: . 7,100 LF of 4" Drain Tile . 7,800 TN of Bituminous Course Mixtures . 1000 LF of Concrete Curb and Gutter . & other Miscellaneous restoration items. Direct inquiries to Engineer's Project Manager, Chuck Boser, at (320) 229-5537 and Chuck.Boser@Stantec.com. Instructions for viewing the bid opening will be made available through QuestCDN and posted on the City's website. The Engineer's Estimate of Construction Cost for this Project is $1,450,000. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. For this project, the City will only accept online electronic bids through QuestCDN. To access the electronic bid, download the project documents and click on the online bidding button at the top of the advertisement. Prospective bidders must be on the plan holders list through QuestCDN for bids to be accepted. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract. one percent of the value of the Contract or $500, whichever is greater, pending completion and submission of all final paperwork by the contractor or subcontractor. For purposes of this, "final paperwork" means documents required to fulfill contractual obligations, including, but not limited to, operation manuals, payroll documents for projects subject to prevailing wage requirements, and the withholding exemption certificate.
Bid Results
Roads / Highways
$1,191,980.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2023
September 11, 2023
To Be Determined, Maple Lake, MN
Related To This Project
Maple Lake, MN
Bid Date: Aug 11 2023
Maple Lake, MN
Bid Date: Jan 04 2024
Maple Lake, MN
Bid Date: Mar 15 2019
Maple Lake, MN
Bid Date: Mar 25 2021
Maple Lake, MN
Bid Date: Apr 10 2024
Maple Lake, MN
Bid Date: Apr 24 2024
Maple Lake, MN
Bid Date: May 08 2024
Maple Lake, MN
Bid Date: May 21 2024
Maple Lake, MN
Bid Date: Mar 22 2023
Maple Lake, MN
Bid Date: Apr 29 2022
Maple Lake, MN
--
Maple Lake, MN
--
Maple Lake, MN
--
Maple Lake, MN
--
Maple Lake, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.