BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Lynwood, California. Completed plans call for the renovation of a educational facility.

Exterior Roofing and Sealing. It is the intent of this contract to provide a fully finished exterior upgrade to all buildings on the existing Marco Antonio Firebaugh High School campus at the Lynwood Unified School District. The attached photographs and specifications are intended to give a general representation of the exterior elements of the buildings only and to give the contractor a basic understanding of the overall scope. Question Deadline 06/26/2023 at 4:00 PM PT Each Bid Proposal shall be accompanied by Bid Security in the form of: (i) a certified or cashiers check made payable to the District or (ii) a Bid Bond, in the form and content included with the Contract Documents in an amount equal to Ten Percent (10%) NO Mandatory Job Walk is required. Exterior Roofing and Sealing. It is the intent of this contract to provide a fully finished exterior upgrade to all buildings on the existing Marco Antonio Firebaugh High School campus at the Lynwood Unified School District. The attached photographs and specifications are intended to give a general representation of the exterior elements of the buildings only and to give the contractor a basic understanding of the overall scope. Firebaugh High School Roofing at Firebaugh HS, Gym, Cafeteria, (Encapsulate), and Portables (Temp Fix) Project BID# 25MAY23-PM Page | 7 1.12. Remove all signage including door and ada signage and reinstall upon completion of finish work with vandal proof screws. 1.13. Re-nail all exposed wood siding where nails are protruding, patch and repair holes prior to refinishing at portables. 1.14. Where existing wood sills occur at windows, the contractor shall completely strip, fill in and repair damaged surfaces and refinish. Del Terra crossed off (keep or delete) 1.9. Surface preparation and re-finishing of all portable building walls, trim, etc. 1.3. Surface preparation of emu walls to receive rainguard products as outlined in specifications. 1.6. Aluminum framed windows and frames are not included in the scope of work including the storefronts. 1.4. Preparation and re-finishing of all existing roof edge flashing/coping. 1.8. Preparation at building foundations against landscaped areas to prepare for a complete water sealer coverage. 1.2. Prepare all painted metallic elements to receive high performance architectural grade paint. 1.7. Preparation and re-finishing of all doors, frames and doors (interior, exterior, strike and hinge sides), door hardware excluded. 1.1. Surface preparation and re-finishing of all exterior plaster and decorative metal frames mounted to emu, plaster soffits, columns, fascia, gutters, downspouts, painted surface mounted conduit, painted data and electrical boxes etc. with a new paint system. Preparation and re-finishing of all exposed metal columns, handrails, guardrails, stair ledgers, downspouts, brackets, decorative metal elements, etc. galvanized metal handrails/guardrails remain unpainted Aluminum framed windows and frames are not included in the scope of work including the storefronts. 1.4. Preparation and re-finishing of all existing roof edge flashing/coping. 1.8. Preparation at building foundations against landscaped areas to prepare for a complete water sealer coverage. 1.2. Prepare all painted metallic elements to receive high performance architectural grade paint. 1.7. Preparation and re-finishing of all doors, frames and doors (interior, exterior, strike and hinge sides), door hardware excluded.

Award

Educational

$766,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
108
Bidding Soon
2,296
All Active Projects
1,020
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2023

August 7, 2023

img_map_placeholder

5246 Martin Luther King Jr Blvd, Lynwood, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.