BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a transportation facility in Coshocton, Ohio. Completed plans call for site work for a transportation facility.

Richard Downing Airport Hangar Construction The work generally consists of: Provide and erect a Hangar Building; site work including foundation, concrete floor slab, concrete paving, grading, and drainage improvements; electrical service and building electrical work; gas service; sanitary sewer connection, heating and air conditioning systems. The successful bidder will be required to complete the work within 120 calendar days. Each bid must be accompanied by a certified or cashier's check in the amount of ten percent (10%) of the amount bid, or a bid guaranty in the amount of one hundred percent (100%) of the bid amount, such check or bid guaranty to be made in favor of the Coshocton County Regional Airport Authority and shall be held as a guarantee that in the event the bid is accepted and a contract awarded to the Bidder, the contract will be duly executed and its performance properly secured. The successful bidder is required to furnish a bond for the faithful performance of the contract in a sum of not less than one hundred percent (100%) of the total bid price for the complete work. PROPOSED BUILDING = 7,145 SQUARE FEET PROPOSED MEZZANINE = 368 SQUARE FEET TOTALAREA= 7,513 SQUARE FEET

Award

Transportation Terminals

$1,083,735.00

Public - County

Site Work

19

5

2

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
128
Bidding Soon
2,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2023

August 7, 2023

Project location map

24569 Airport Rd, Coshocton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.