BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Fort Collins, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000317853 Question Acceptance Deadline 07/07/2023 05:00 PM EDT Questions are submitted online No Contact Information Adam Hill 970-221-6777 adhill@fcgov.com The City of Fort Collins is requesting proposals from qualified Construction Managers/General Contractors (CM/GCs) for CM/GC services related to the construction of corridor safety improvements to include pedestrian paths and separated bikeways on Laporte Ave from N Sunset St to Fishback Ave. The project will be completed in two (2) phases. The first phase will be the East Segment which will be from Fishback Ave. to Frey Ave as shown in in the Attachment 1 95% plan set. It is the Citys goal to have construction completed on the East Segment in 2023. The second phase will be the West Segment which will be from the east of Taft Hill Road to Sunset Street as indicated in Attachment 2 30% plan set. A portion of the West Segment just west of Taft Hill Road near Poudre School is to be constructed in an existing flood plain, design of this area is currently being developed. The West Segment will also need to coordinate closely with Poudre School District and local businesses in order for them to maintain operations. No full road closures will be allowed, all construction must be phased to maintain access throughout project duration. Construction for the West Segment is not currently funded, but the City anticipates funding to be in place for construction in the 2024 season.

Post-Bid

Roads / Highways

$2,126,000.00

Public - City

Paving, Site Work

4

5

4

3

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
66
Bidding Soon
902
All Active Projects
389
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2023

September 12, 2023

img_map_placeholder

Laporte Ave, Fort Collins, CO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.