Renovation of a fire / police facility in Toledo, Ohio. Completed plans call for the renovation of a fire / police facility.
Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Liquidated Damages $250 Toledo Department of Fire and Rescue is soliciting bids for the replacement of Fire Stations #4, 18, 19, 23, & 25's roofs according to relavtive RFQ. Ensure said bids factor in a total project completion time of 180 days from date of Purchase Order issue. Scope of Work - Toledo Fire Station 4 3940 Hill Ave. Toledo, OH 43607 Scope of Work (Upper Roof Area Only): o Contractor responsible for the measurements, core tests, and pull tests necessary to complete the project scope of work. o The contractor shall properly prepare the top surface of the existing modified bitumen roof to adhere a newPVCfleece membrane, by removing allloose granules. Thecontractor shall also remove and properly dispose oftheexisting sheetmetal edge. o The contractor shall provide a unit cost with their base bid for the removal and replacement of any saturated insulation if anyisfound during the project. o There will be no new additional insulation added on this project. o The contractor shall install afully adhered, 60mil, reinforced PVC fleece-back membrane roof system onthe deck oftheroof area. Thecontractor shall adhere thefleece membrane tothe existing smooth built-up roof system with a low-rise foam adhesive approved by the roof system manufacturer. Follow all manufacturer specifications. o Install curb flashings on any existing roof curbs per manufacturer specifications. Install stack flashings around allstack penetrations, back seal boot and useastainless steel clampto seal offthetopofthe stack, per manufacturer's specifications. The contractor shall coordinate withToledo Fire&Rescue Department regarding the removal of any curbs, stacks, or anything else onthe roofthat are no longer being used, anddeck inthe roof deck properly after theremoval of anyroof curbs or stacks. o For perimeter roof edgefascia,thecontractor shall runthe membrane over theedgeand terminate the new membrane with a 8" 2-piece compression edge (24-gauge cover, standard Kynar finish selected by Toledo Fire&RescueDepartment) per manufacturer specifications. o Thecontractor shallinstall anewwalkway padatthe ladder access location. For the purposes ofthis project,thecontractor shall estimate 1 walkway pad for this project. o Upon completion, the roof system manufacturer shall inspect all work complete, and issue a 20-year NDL, labor&material manufacturer warranty toToledo Fire&Rescue Department. Scope of Work - Toledo Fire Station # 18 5225 Lewis Street Toledo, OH 43612 Scope of Work (includes all low-slope roof areas on the building, including entrance roofs): o Contractor responsible for the measurements, core tests, and pull tests necessary to complete the project scope of work. o The contractor shall remove and properly dispose of all loose gravel from the roof. The contractor shall also remove and properly dispose of existing sheet metal gutters and downspouts. o The contractor shall provide a unit cost with their base bid for the removal and replacement of any saturated insulation, if any is found during the project. o Contractor shall install one layer of 1.5'' polyisocyanurate insulation over all of the roof areas, mechanically attached. The contractor shall install a 4x4 target sump at each roof drain. o The contractor shall install a mechanically attached, 60 mil, reinforced PVC membrane roof system on the deck and perimeter wall flashings. o Install curb flashings on any existing roof curbs per manufacturer specifications. Install stack flashings around all stack penetrations, back seal boot and use a stainless steel clamp to seal off the top of the stack, per manufacturer's specifications. The contractor shall coordinate with Toledo Fire & Rescue Department regarding the removal of any curbs, stacks, or anything else on the roof that are no longer being used, and deck in the roof deck properly after the removal of any roof curbs or stacks. o For existing drains, the contractor shall terminate the membrane into the existing plumbing per manufacturer specifications. o For any base wall flashing, the contractor shall cut out and remove the existing counterflashing. The contractor shall install the parapet flashings to go up to the same height as the existing flashing. Terminate the flashing with a termination bar and then install a new 1-pc counterflashing made of 24-gauge steel in the same color selected for the edge metal, per manufacturer specifications. o For perimeter parapet walls, the contractor shall install a new Prebuck wood nailer on top of the existing stone cap. Then, the contractor shall run the parapet flashings up and over the new Prebuck nailer and terminate the new membrane parapet flashings with a 5'; 2- piece compression edge (24-gauge cover, standard Kynar finish selected by Toledo Fire & Rescue Department) per manufacturer specifications. o For the interior parapet wall, the contractor shall remove the sheet metal cap and properly dispose of it. The contractor shall completely cover the interior parapet wall with new membrane. o The contractor shall install a new 6" commercial gutter (24-gauge, standard Kynar finish) complete with endcaps, splice joints, and hangers). The contractor shall install new 4x4 downspouts (24-gauge, standard Kynar finish) complete with outlets, elbows, and straps. The contractor shall terminate the membrane in the new gutter with termination bar, per manufacturer specifications. o The contractor shall install a new walkway pad at the bottom and top of the exterior wall ladder, and two new walkway pads on the serviceable side of each unit that requires regular maintenance. For the purposes of this project, the contractor shall estimate 8 walk pads for this project. o Upon completion, the roof system manufacturer shall inspect all work complete, and issue a 20-year NDL, labor & material manufacturer warranty to Toledo Fire & Rescue Department. Scope of Work - Toledo Fire Station # 19 4257 Stickney Street Toledo, OH 43612 Scope of Work (includes all low-slope roof areas on the building, including entrance roofs): o Contractor responsible for the measurements, core tests, and pull tests necessary to complete the project scope of work. o The contractor shall remove and properly dispose of all loose gravel from the roof The contractor shall also remove and properly dispose of existing sheet metal copings from the perimeter walls. o The contractor shall provide a unit cost with their base bid for the removal and replacement of any saturated insulation, if any is found during the project. o Contractor shall install one layer of 1.5'' polyisocyanurate insulation over all of the roof areas, mechanically attached. The contractor shall install a 4x4 target sump at each roof drain. o The contractor shall install a mechanically attached, 60 mil, reinforced PVC membrane roof system on the deck and perimeter wall flashings. o Install curb flashings on any existing roof curbs per manufacturer specifications. Install stack flashings around all stack penetrations, back seal boot and use a stainless steel clamp to seal off the top of the stack, per manufacturer's specifications. The contractor shall coordinate with Toledo Fire & Rescue Department regarding the removal of any curbs, stacks, or anything else on the roof that are no longer being used, and deck in the roof deck properly after the removal of any roof curbs or stacks. o For existing drains, the contractor shall terminate the membrane into the existing plumbing per manufacturer specifications. o For any base wall flashing, the contractor shall cut out and remove the existing counterflashing. The contractor shall install the parapet flashings to go up to the same height as the existing flashing. Terminate the flashing with a termination bar and then install a new 1-pc counterflashing made of 24- gauge steel in the same color selected for the edge metal, per manufacturer specifications. o For perimeter parapet walls, the contractor shall run the parapet flashings up and over the wall. The contractor shall terminate the new membrane parapet flashings with a 5" 2-piece compression edge (24- gauge cover, standard Kynar finish selected by Toledo Fire & Rescue Department) per manufacturer specifications. o Contractor shall install two new walkway pads on the serviceable side of each unit that requires regular maintenance. For the purposes of this project, the contractor shall estimate 4 walk pads for this project. o Upon completion, the roof system manufacturer shall inspect all work complete, and issue a 20-year NDL, labor & material manufacturer warranty to Toledo Fire & Rescue Department. Scope of Work - Toledo Fire Station # 23 2754 W. Laskey Road Toledo, OH 43613 Scope of Work (includes all low-slope roof areas on the building, including entrance roofs): o Contractor responsible for the measurements, core tests, and pull tests necessary to complete the project scope of work. o Thecontractor shall remove and properly dispose ofall loose gravel(including the moss/biological growth) from the roof. The contractor shall also remove and properly dispose of existing sheet metal copings from the perimeterwalls. o The contractor shall provide aunit costwith theirbase bid for theremoval and replacement ofany saturated insulation, if anyis found during theproject. o Contractor shall install one layer of 1.5" polyisocyanurateinsulation over all ofthe roof areas, mechanically attached. Thecontractor shall install a4x4 target sumpat each roofdrain. o The contractor shall install a mechanically attached, 60 mil, reinforced PVC membrane roof system on thedeck and perimeterwallflashings. o Install curb flashings on any existing roof curbs per manufacturer specifications. Install stack flashings around all stack penetrations, back seal boot and usea stainless steel clamptoseal offthetop ofthe stack, permanufacturer'sspecifications. The contractor shall coordinate withToledo Fire&Rescue Department regarding the removal ofany curbs, stacks, or anything else ontheroofthatarenolonger being used, and deck inthe roof deck properly after the removal of any roof curbs or stacks. o For the railing atthe cornerofthe roof,the contractor shall install avinyl-coated metal pitch pan with self-leveling pitch panfiller oneach post, per roofing manufacturer specifications. o For existing drains, the contractor shall terminate the membrane into the existing plumbing per manufacturer specifications. o For any basewallflashing,thecontractor shall cutout and remove theexisting counterflashing. The contractor shall installthe parapet flashings to go uptothe same height astheexisting flashing. Terminate theflashingwith aterminationbar andtheninstall anew1-pc counterflashingmadeof 24-gauge steel inthesamecolor selected for the edge metal, permanufacturer specifications. o For perimeter parapet walls,thecontractor shall runthe parapetflashings upand over the wall. The contractor shall terminate the new membrane parapet flashings with a 5" 2-piece compression edge (24-gauge cover, standardKynar finishselected byToledo Fire&Rescue Department) per manufacturer specifications. o Contractor shall installtwo newwalkway pads ontheserviceable side ofeach unitthat requires regular maintenance. For the purposes ofthis project,the contractor shall estimate 4walkpads for this project. o Upon completion, the roof system manufacturer shall inspect all work complete, and issue a 20-year NDL, labor& material manufacturer warranty toToledo Fire& Rescue Department. Scope of Work - Toledo Fire Station # 25 2933 W. Central Avenue Toledo, OH 43606 Scope of Work (Upper Roof Area Only): o Contractor responsible for the measurements, core tests, and pull tests necessary to complete the project scope of work. o The contractor shall properly prepare the top surface of the existing smooth built-up roof to adhere a new PVC fleece membrane. The contractor shall also remove and properly dispose of existing sheet metal edge copings, gutters, and downspouts. o The contractor shall provide a unit cost with their base bid for the rernoval and replacement of any saturated insulation, if anyis found during the project. o There will be no new additional insulation added on this project. o The contractor shall install afullyadhered, 60mil, reinforced PVCfleece-back membrane roof system onthedeck ofthe roof area.Thecontractor shall install 50 mils reinforced PVC membrane onthe perimeter wall flashings. The contractor shall adhere the fleece membrane to the existing smooth built-uproof system withalow-rise foamadhesive approved by the roof system manufacturer. Followall manufacturer specifications. o Install curb flashings on any existing roof curbs per manufacturer specifications. Install stack flashings around allstack penetrations, back seal boot and use astainless steel clamptoseal offthe topofthe stack,per manufacturer'sspecifications. The contractor shall coordinate withToledo Fire&Rescue Department regarding the removal of any curbs, stacks,or anything elseonthe roofthat are no longer beingused, and deckinthe roof deck properly after the removal of any roof curbs or stacks. o For perimeter parapet walls, the contractor shall run the parapet flashings up and over the parapet walls and terminate the new membrane with a 5" 2-piece compression edge (24-gauge cover, standard Kynar finish selected by Toledo Fire & Rescue Department) per manufacturer specifications. o The contractor shall install a new 6" commercial gutter (24-gauge, standard Kynar finish) complete with endcaps, splice joints, and hangers). The contractor shall install new4x4 downspouts (24-gauge, standardKynar finish) complete with outlets, elbows, andstraps. The contractor shallterminate the membrane inthe newgutterwithtermination bar, per manufacturer specifications. o The contractor shallinstall anewwalkway pad attheladder accesslocation, and two new walkway pads ontheserviceable sideofeach unitthat requires regular maintenance. For the purposes ofthis project,thecontractor shallestimate 3walk pads for this project. o Upon completion, the roof system manufacturer shall inspect all work complete, and issue a 20-year NDL, labor& material manufacturer warranty toToledo Fire& Rescue Department.
Bid Results
Fire / Police
$464,667.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 5, 2023
August 4, 2023
Multiple Locations, Toledo, OH
Related To This Project
Toledo, OH
Bid Date: Jun 27 2023
Toledo, OH
Bid Date: Jul 07 2023
Toledo, OH
Bid Date: Aug 01 2023
Toledo, OH
Bid Date: Jul 27 2023
Toledo, OH
Bid Date: Jul 25 2023
Toledo, OH
Bid Date: Apr 09 2024
Toledo, OH
Bid Date: Aug 26 2021
Toledo, OH
Bid Date: Jun 27 2023
Toledo, OH
Bid Date: Jun 27 2023
Toledo, OH
Bid Date: Jun 23 2023
Toledo, OH
Bid Date: Jun 04 2024
Toledo, OH
Bid Date: Jun 20 2023
Toledo, OH
Bid Date: Jun 13 2023
Toledo, OH
Bid Date: Jun 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.