BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Wiley Ford, West Virginia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Construction of approximately 2000 LF of Taxiway including erosion and sediment controls, removal of existing pavement, windcone and storm pipe, 20,000 cy of unclassified excavation, 4,500 cy of crushed aggregate base course, 2,200 TN of HMA base course, 2,400 TN of HMA wearing course, 12 Type G Inlets, 2,400 LF of 36" HDPE, 130 New LED MITL, L-861T on Existing Base Cans and 33 New LED MITL on New Base Cans, 15,400 LF of No. 8 AWG, 5kV, L-824 Type C Cable and 5,500 LF of No. 6 AWG, Solid bare copper counterpoise wire and 5400 LF of non-encased electrical conduit 2 Bidsshall be accompanied by a certified check or bid bond payable to Potomac Highlands Airport Authority in an amount equal to five percent (5%) of the base bid FAA AIP PROJECT 3-24-0013-032-2022 (Design) FAA AIP PROJECT 3-24-0013-Pending (Construction) MAA Project No. GR-19-Pending (Construction) WVDMTF Project No. Pending The Project includes the following Work: Construction of approximately 2000 LF of Taxiway including erosion and sediment controls, removal of existing pavement, windcone and storm pipe, 20,000 cy of unclassified excavation, 4,500 cy of crushed aggregate base course, 2,200 TN of HMA base course, 2,400 TN of HMA wearing course, 12 Type G Inlets, 2,400 LF of 36" HDPE, 130 New LED MITL, L-861T on Existing Base Cans and 33 New LED MITL on New Base Cans, 15,400 LF of No. 8 AWG, 5kV, L-824 Type C Cable and 5,500 LF of No. 6 AWG, Solid bare copper counterpoise wire and 5400 LF of non-encased electrical conduit 2" The Work will be substantially completed within 270 calendar days after the date when the Contract Times commence to run and completed and ready for final payment within 300 days after the date when the Contract Times commence to run. Liquidated damages shall be $3,000 per day. Biddershallsubmit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. njones@thethrashergroup.com and bashley@thethrashergroup.com

Award

Transportation Terminals

$3,588,422.00

Public - City

Paving, Site Work

44

13

9

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
44
Bidding Soon
892
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2023

September 5, 2023

img_map_placeholder

165 Terminal Loop, Wiley Ford, WV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.