BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a road / highway in Salinas, California. Completed plans call for the renovation of a road / highway.

The general work description for the "LAS LOMAS DRIVE BICYCLE LANE AND PEDESTRIAN PROJECT" is the construction and widening of Las Lomas Drive from Hall Road to Thomas Road, including but not limited to clearing and grubbing, traffic control, excavation and backfill, storm drain pipe installation, retaining walls, drainage system, curb and gutter and sidewalks, bioretention facilities, and pavement. Such other items or details, not mentioned above, that are required by the Construction Plans, Standard Specifications, Standard Plans, or these Special Provisions, shall be performed, placed, constructed, and/or installed. The Engineer's Estimate for the construction costs is $3,040,000. The County of Monterey hereby notifies all bidders that it will affirmatively insure that in any agreement entered into pursuant to this advertisement, Disadvantage Business Enterprises (DBEs) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, national origin, religion, age, or disability in consideration for an award. The contractor, subrecipient, or contractor shall take necessary and reasonable steps to ensure that DBEs have the opportunity to participate in this contract. The DBE goal is Nineteen percent (19%). For the Federal Training Program, the number of trainees or apprentices is 1. The Bidder shall possess a valid Class A General Engineering Contractor's license. The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (Public Contract Code 10164). The Contractor awarded the Contract shall begin work when authorized by the County of Monterey. This work shall be diligently prosecuted to completion before the expiration of 100 WORKING DAYS beginning on the date listed on the issuance of the "Notice to Proceed". Plant establishment period is ninety working days (90-days) beginning the day after 100% of the work is accepted. A bidder's bond, issued by an admitted corporate surety company in an amount equal to at least ten percent (10%) of the amount bid, must accompany the bid. The successful bidder shall furnish a payment bond and a performance bond each in the amount of one hundred percent (100%) of the Contract

Post-Bid

Roads / Highways

$3,040,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
21
Bidding Soon
819
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

August 28, 2023

img_map_placeholder

To Be Determined, Salinas, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.