Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Mableton, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of February 5, 2024, the project has been awarded, however, a timeline for construction has not been confirmed. Mableton Parkway Pedestrian Improvements, Phase 2 Project Description Mableton Parkway Pedestrian Improvements, Phase 2, includes construction of a ten-foot wide multi-use trail on the west side of Mableton Parkway, from Veterans Memorial Highway to Factory Shoals Road. Sidewalks will be added to fill in the gaps within a segment of existing trail, providing a continuous connection from just north of the Chattahoochee River to the Silver Comet Trail. Traffic Signal Upgrades are also included at signalized intersections within the project limits. The total project length of Phase 2 is approximately 1.30 miles. Cobb County Water System work is also included. Project Duration: The time allowed for performance of the project will be 530 days from issuance of Notice to Proceed. Project partially funded by the Federal Transit Administration (FTA) and Local Funds. Davis-Bacon wage rates for Cobb County, GA will also apply. This project is partially funded by the Federal Transit Administration (FTA) and local funds. Accordingly, the successful bidder will be required to comply with all applicable FTA, Federal and State rules and regulations, as well as those of Cobb County. Contractor shall at all times comply with all applicable FTA regulations, policies, procedures and directives, including without limitation those listed directly or by reference in the Master Agreement, as they may be amended or promulgated from time to time during the term of this contract. The project must also conform to all American with Disabilities Act (ADA) regulations. All bidders submitting bids in excess of $2,000,000.00 must be prequalified with the Georgia Department of Transportation (GDOT). All bidders submitting bids of $2,000,000.00 or less shall be registered subcontractors or prequalified with GDOT. Subcontractors must be prequalified or registered with GDOT. DBE firms must be certified with the Georgia Department of Transportation's Equal Employment Opportunity (EEO) office. ALL NEW PROSPECTIVE BIDDERS ARE STRONGLY ENCOURAGED TO PRE-REGISTER WITH COBB COUNTY FINANCE PRIOR TO BID CLOSING. Contractor must meet the current bid requirements of the Georgia Department of Transportation. Contractor and their subcontractors are required to be in compliance with the "Georgia Security and Immigration Compliance Act." Cobb County will affirmatively comply with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21 Nondiscrimination Act(s). Disadvantaged Business Enterprise (DBE) Participation and Small Business Participation in all DOT contracts is encouraged. The Cobb County Board of Commissioners reserves the right to reject all Bids and waive any formalities. Mableton Parkway Pedestrian Improvements, Phase 2, includes construction of a ten-foot wide multi-use trail on the west side of Mableton Parkway, from Veterans Memorial Highway to Factory Shoals Road. Sidewalks will be added to fill in the gaps within a segment of existing trail, providing a continuous connection from just north of the Chattahoochee River to the Silver Comet Trail. Traffic signal upgrades are also included at signalized intersections within the project limits. The total project length of Phase 2 is approximately 1.30 miles.
Award
Roads / Highways
$3,003,847.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2023
September 11, 2023
Mableton Pkwy, Mableton, GA
Related To This Project
Mableton, GA
--
Mableton, GA
Bid Date: Feb 19 2024
Mableton, GA
--
Mableton, GA
Bid Date: Jan 12 2022
Mableton, GA
--
Mableton, GA
--
Mableton, GA
Bid Date: Jan 13 2022
Mableton, GA
--
Mableton, GA
--
Mableton, GA
--
Mableton, GA
--
Mableton, GA
Bid Date: Oct 01 2023
Mableton, GA
--
Mableton, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.