BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Costa Mesa, California. Completed plans call for the renovation of a 160,000-square-foot educational facility; and for site work for a educational facility.

Field renovation at 3 schools: Whittier Elementary, Harper Assessment, Davis. See attached scope and project locations. District will provide 40 yard dumpster, contractor to coordinate with District. Contractor to provide temporary fencing around the project area, including laydown/staging for the duration of the project. See fencing specs below: Install 6' tall (min.) temporary construction fence prior to beginning any site work, at the perimeter of the entire project. Contractor may use existing perimeter fence to help secure work area. Temporary fence shall be chain line (new or used), free of openings or breaks in the fabric, with fence posts at 10' O.C. maximum. Fence posts shall be supported by base stands and ballasted for support; posts shall not be driven into the soil. The fence shall be maintained in place throughout the duration of the contracted work. Install "No Trespassing" signs minimum 50' O.C. in both English and Spanish. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 06/23/2023 4:00 PM (PDT) Liquidated Damages $750/Day BIDDER INFORMATION AND EXPERIENCE FORM Each Bidder shall complete the questionnaire provided herein and shall submit the questionnaire along with its Bid. Failure to provide all information requested within the questionnaire along with the Bid may cause the Bid to be rejected as non-responsive. The District reserves the right to reject any Bid if an investigation of the information submitted does not satisfy the District that the Bidder is qualified to properly carry out the terms of the Contract. Field renovation at 3 schools: Whittier Elementary, Harper Assessment, Davis. See attached scope and project locations. District will provide 40-yard dumpster, contractor to coordinate with District. Contractor to provide temporary fencing around the project area, including laydown/staging for the duration of the project. See fencing specs below: Install 6' tall (min.) temporary construction fence prior to beginning any site work, at the perimeter of the entire project. Contractor may use existing perimeter fence to help secure work area. Temporary fence shall be chain line (new or used), free of openings or breaks in the fabric, with fence posts at 10' O.C. maximum. Fence posts shall be supported by base stands and ballasted for support; posts shall not be driven into the soil. The fence shall be maintained in place throughout the duration of the contracted work. Install "No Trespassing" signs minimum 50' O.C. in both English and Spanish. The use of pesticides/herbicides in schools, while not anticipated for this project, is highly regulated and governed by the Healthy Schools Act. Contractor shall coordinate any anticipated use of pesticides/herbicides with the District no less than five (5) business days prior to the application of any pesticide/herbicide so they District can take necessary steps for compliance with the Healthy Schools Act. Only products listed in the District's IPM plan

Award

Educational

$122,133.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
113
Bidding Soon
2,438
All Active Projects
958
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

July 31, 2023

img_map_placeholder

Multiple Locations, Costa Mesa, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.