EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Victorville, California. Completed plans call for site work for a water / sewer project.

Due to bird nesting season earliest Start Date - Tuesday September 5, 2023. The work consists of providing all materials, labor, tools, equipment, facilities, transportation and incidentals necessary to construct: The replacement and upsizing of the existing piping and appurtenances within the existing vault from 8- inch to 12-inch diameter, additional 8-inch hot tap and valving to a 12-inch diameter steel pipe for dewatering purposes, and installation of a temporary bypass pumping system for the duration of the project. The site of the work is located in: Hesperia, California The site address is: Lake Arrowhead Road, Hesperia CA All questions relative to this project prior to the opening of bids shall be directed to the manager of the project: Lake Arrowhead Community Services District PO Box 700, Lake Arrowhead, CA 92352 (USPS) 27307 State Highway 189, Blue Jay, CA 92317 (FedEx, etc.) Project Manager: Scott Schroder Telephone: (909) 336-7136 Fax: (909) 337-6715 E-mail: sschroder@lakearrowheadcsd.com. Deadline for questions - Monday July 3, 2023 Per General Conditions, Section B - Preliminary Matters, the Contractor will be required to furnish with the Contract a performance bond in the amount of one hundred percent (100%) on the aggregate amount of the bid, and a labor and material bond in the amount of one hundred percent (100%) of the bid. The Contractor shall also furnish certificate(s) of insurance evidencing that all insurance coverage, along with applicable endorsements as required by the specifications, has been so secured. A warranty bond shall be furnished by the Contractor upon completion of the work for maintenance and guarantee of all work. The warranty bond can be furnished by an extension of the faithful performance bond after completion of the work.All bids shall be accompanied by a cashier's or certified check, payable to the order of the District (Lake Arrowhead Community Services District), amounting to ten percent (10%) of the bid, or by a bond in said amount and payable to said District, signed by the bidder and a Corporate Surety, or by the bidder and two sureties who shall justify before any officer, competent to administer an oath, in double said amount and over and above all statutory exemption. Said check shall be forfeited or said bond shall become payable to said District in case the bidder depositing the same does not, within ten (10) calendar days after written notice, sign the Contract. Additional bond forms are available at the District office. If a bid bond is submitted, satisfactory bid bond payable to District executed by the bidder as principal and an admitted surety approved to conduct business in the State of California as surety, in an amount not less than 10% of the maximum amount of the bid. Personal sureties and unregistered surety companies are unacceptable. The California admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be a satisfactory corporate surety. The cash, check or bid bond shall be given as a guarantee that the bidder shall execute the Contract if it be awarded to the bidder in conformity with the Contract Documents and shall provide the surety bond or bonds as specified therein within ten (10) calendar days after notification of the award of the Contract to the bidder. Failure to provide an appropriate bid bond shall cause the bid to be rejected.All work shall be completed within forty-five (45) calendar days after the date of Contract Notice to Proceed by the District. After all documents, bonds, and required support materials have been submitted as required by the project specifications, the District will issue a Notice to Proceed giving the Contractor ten (10) working days to start. This Notice to Proceed shall be delivered to the Contractor electronically, deposited in the United States mail or provided to the Contractor at the preconstruction conference at the latest. A preconstruction conference will be convened by the District regarding the project.It has been determined that the damage sustained by the District as a result of Contractor's breach of his agreement to complete work within the time agreed upon may result in damages of $100.00 per calendar day. As described in the Special Conditions, Part 11.0, "Liquidated Damages", are AS PART OF THIS NOTICE DECLARED TO THE CONTRACTOR.

Award

Water / Sewer

$294,578.00

Public - City

Site Work

7

15

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Physical Decontamination
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Retaining Walls
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
119
Bidding Soon
2,111
All Active Projects
959
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2023

August 14, 2023

img_map_placeholder

Arrowhead Rd, Victorville, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Dam Vault Upsize Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.