BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2024 at 8:00 PM

Updated June 4, 2024

Site work for a water / sewer project in Atlanta, Georgia. Completed plans call for site work for a water / sewer project.

Design-Builder shall perform all design and construction services, and provide material, equipment, tools and labor, necessary to complete the Work described in and reasonably inferable from the Contract Documents. The project scope includes engineering design services, permit acquisition, easement acquisition, material procurement, construction, and commissioning services for the new sewer assets. Design services shall include planning, sequencing, and scheduling the work to replace sewers without spills, overflows, or unreasonable interruption of service. Plan a sequence of work to commence construction as soon as practicable following preliminary engineering design, and to continue simultaneous design and construction to complete the project. City's Contact Person: Connie Donley, Category Lead; cdonley@atlantaga.gov Time is of the Essence. Owner and Design-Builder mutually Liquidated Damages. Design-Builder understands that if Substantial Completion is not attained by the Scheduled Substantial Completion Date, Owner will suffer damages which are difficult to determine and accurately specify. Design-Builder agrees that if Substantial Completion is not attained by 670 days of Substantial Completion Date, (the "LD Date"), Designer-Builder shall pay Owner two thousand ($ 2,000), as liquidated damages for each calendar day that Substantial Completion extends beyond the LD Date. Design-Builder understands that if Final Completion is not achieved within 60 days of the Substantial Completion Date, Owner will suffer damages which are difficult to determine and accurately specify. DesignBuilder agrees that if Final Completion is not achieved within 60 days of Substantial Completion, DesignBuilder shall pay to Owner two thousand ($ 2,000), as liquidated damages for each calendar day that Final Completion is delayed beyond the above-referenced number of days. The milestone schedule below assumes a design-build delivery of the project on or before: May 1, 2026 NTP Issuance - April 2024 Substantial Completion - February 2026 Project Completion - April 2026 Site Visit: N/A Deadline to Submit Questions in Writing: Friday, February 16, 2024 by 5:00 PM (ET) via Email

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
187
Bidding Soon
2,274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 1, 2024

Project location map

Multiple Locations, Atlanta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.