Site work for a transportation facility in San Jose, California. Completed plans call for site work for a transportation facility.

As of June 11, 2024, this project has commenced construction in April 2024. All trades have been awarded. Scope of work includes the construction of an aerial guideway (with MSE Wall approaches), two passenger stations (Story Station and Eastridge Station), a new pedestrian overcrossing at Story Station, trackwork, systems (including two traction power substations), underground drainage, minor road widening, and landscaping. Work also includes adding a section of overhead traction electrification supplemental feeder system on the existing light rail system north of the Alum Rock Light Rail Station. Email questions to procurement@vta.org The estimated value of the contract is $300 million to $350 million. Submit questions via the OpenGov procurement portal or email your questions to: cathy.clegg@vta.org The Project will also require Bidder to: Have ten years of experience performing bridge aerial guideway construction work. Have ten years of experience performing pile driving work. Have ten years of experience performing traction electrification work. Have ten years of experience performing light rail signal work. Have ten years of experience performing railroad track construction work. Have worked on a minimum of 3 Project(s) over $150 Million. Self-perform at least 30% of the value of the original total bid. The estimated cost of construction for the Project is in the range of $275 million to $300 million. The estimated duration for construction of the Project is between 1,250 and 1,600 calendar days, depending on the Contractors bid for time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *This project has been awarded and all trades have been let.

Under Construction

Transportation Terminals

$458,411,464.00

Public - County

Site Work

136

171

340

6

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
8
Bidding Soon
1,495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

April 15, 2024

Project location map

Multiple Locations, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.