Site work for a water / sewer project in Bend, Oregon. Completed plans call for site work for a water / sewer project.

The project involves the rehabilitation of two primary clarifiers at the Water Reclamation Facility. This includes demolition, removal, and replacement of sludge collecting mechanisms, access bridges, weirs and baffles, spray water system, mechanical drive, electrical conduits, light poles, control panels, and other equipment. Concrete floor rehabilitation and spot repairs on the existing launder walls are also part of the project. Questions Due Date: Jul 17th 2023, 4:00 PM PDT *The value for this project is based on a financial range. The Engineer's estimate is between $2,070,000 and $2,645,000. The Project Manager for this project is: Dade Pettinger, Engineering Associate. Any questions regarding the bid documents should be submitted to the Issuing Officer only via the City's Portal. Description of Project: The scope of work includes, but is not limited to, the rehabilitation of two primary clarifiers located at the WRF, which is located Northeast of the City. For each clarifier, the Project involves demolition and removal of existing sludge collecting mechanisms and appurtenances, access bridges, including stairs and handrails, weirs and baffles, spray water system, mechanical drive, electrical conduits/associated wiring, light poles, and control panels. New components to be installed will generally include new sludge collector mechanisms and appurtenances, access bridges including stairs and handrails, weirs and baffles, spray water system, mechanical drive, electrical conduits/associated wiring, light poles, control panels and other ancillary equipment required for a complete system. The existing concrete floor of each clarifier will also be rehabilitated along with concrete spot repairs on the existing launder walls of both clarifiers. The Engineer's estimate is between $2,070,000 and $2,645,000. Location of Project: The project is located at the City's Water Reclamation Facility, 22395 McGrath Road, Bend, OR 97701 Purpose of Project: Purpose of project is to extend the useful life of Primary Clarifiers 1 and 2. The existing equipment has reached the end of its useful life and will be replaced to ensure continual operation of the clarifiers.

Award

Water / Sewer

$2,436,720.00

Public - City

Site Work

26

26

15

6

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
3
Bidding Soon
59
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.