BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Edmonton, Alberta. Completed plans call for the renovation of a municipal facility.

Work of this Contract comprises the following: Decant the Labour Building and return building to base building standards in preparation for lease end and hand back to Landlord The scope of project includes all floors (Main floor to 10th), the basement, and storage rooms/areas Remove all furniture, filling cabinets, office supplies, photocopiers, fridge, dishwashers, stock in trade and other tangible office items Disassemble and remove systems furniture, office partitions and dividers, file shelves, shelves, and shelving units as instructed by the province Remove items remaining in the server room as directed. Remove data racks, UPS, IT, and electrical components Remove electrical components such as power pac-poles and other electrical appliances and components as instructed by the Province Ensure electrical work scope is handled by a qualified Journeyman Electrician and left in safe condition such that they will pose no harm, danger, or safety hazard to the building or persons Ensure all plumbing related work is completed by a qualified Journeyman Plumber Secure cables, IT and network cabling, and wiring as instructed by the Province Remove office, bulletin, and cork boards as instructed by the Province Make good of damages caused by the decanting process and removal of items Ensure each floor is left in "broom clean" and safe condition Items removed from the building will be taken to either GOA surplus or recycle programs. Items shall also be taken to other locations as instructed by the Province. Separate items for recycling and landfill Items will be appropriately labelled for move Work within the building regulations and rule of work authorisation/permit. Elevator, lobby and other shared areas must be kept clear and clean at all times Provide all materials, equipment, expertise, labour, and sub contractors required to completely decant the building and complete the workscope stated herein Arrange loading dock availability with Facility representative Limit items movement to designated delivery/moving elevator Always adhere to loading dock regulation. The loading dock is the only building entrance for large moves Always adhere to facility/building move-in/out procedures Award is subject to final approval.

Award

Municipal

$157,534.00

Public - State/Provincial

Renovation

15

10

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
245
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2023

August 7, 2023

img_map_placeholder

10808 99 Ave, Edmonton, AB

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.