Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Stuart, Florida. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.
The project generally will entail regrading the NW Dixie Highway ditch to restore permitted drainage elevations of 0.50 NAVD. In addition, the existing 24 culvert that conveys ditch drainage from north to south under NW Fern Street will be replaced with a new 30" culvert at invert 0.50' NAVD, to restore permitted drainage elevations. Work will also include rip-rap installation at culvert locations within the ditch, removal of an FDOT weir upstream of the ditch, removal and replacement of the NW Australian Street outfall structure, and modification of two outflow structures on the south end of Dixie Highway, helping to alleviate upstream flooding issues in the Riverside Park neighborhood. All performance of the Contract Work shall be completed within one hundred eighty (180) calendar days of the date of issuance of the NTP. The Contractor shall pay to the party of the first part, as damages for non-completion of the work within the time stipulated for its completion, one hundred dollars ($100.00) for each and every day for the first thirty (30) days and five hundred dollars ($500.00) for each and every day thereafter, which may exceed the stipulated time for its completion, is hereby agreed upon, fixed and determined by the parties hereto as liquidated damages that the party of the first part will suffer by reason of such default and not by way of penalty. It is hereby understood and mutually agreed by and between parties hereto that the time of completion is an essential condition of this contract. By submitting a proposal response, successful respondent agrees to start the work within ten (10) days of issuance of Notice to Proceed. All performance of the Contract Work shall be completed within one hundred and eighty (180) calendar days of the date of issuance of the NTP. Commencement of the Contract Work by the Contractor shall be deemed a waiver of the NTP and shall constitute the date of commencement for the purpose of the completion deadline. Question Deadline 06/30/2023 at 2:48 PM ET A proposal guarantee must be submitted with the proposal, if the total amount proposed exceeds $50,000. The bond shall be in an amount equal to ten percent (10%) of the total amount The successful bidder, when awarded a contract, will be required to furnish payment and performance bonds with a carrier duly licensed and authorized to do business in the State of Florida, equal to one hundred percent (100%) of the total amount of the contract to assure faithful performance and timely payments to all persons providing labor, materials or supplies used in the performance of the work
Award
Roads / Highways
$896,249.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2023
August 10, 2023
NW Dixie Hwy, Stuart, FL
Related To This Project
Stuart, FL
Bid Date: Jul 26 2023
Stuart, FL
Bid Date: Sep 20 2023
Stuart, FL
Bid Date: Aug 02 2023
Stuart, FL
Bid Date: Aug 02 2023
Stuart, FL
Bid Date: Aug 09 2023
Stuart, FL
Bid Date: Aug 02 2023
Stuart, FL
Bid Date: Aug 09 2023
Stuart, FL
Bid Date: Aug 09 2023
Stuart, FL
Bid Date: Jul 19 2023
Stuart, FL
Bid Date: Jul 19 2023
Stuart, FL
Bid Date: Jul 26 2023
Stuart, FL
Bid Date: Jun 30 2023
Stuart, FL
Bid Date: Jun 14 2023
Stuart, FL
Bid Date: Sep 23 2020
Stuart, FL
Bid Date: Oct 21 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.