BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2024 at 8:00 PM

Updated August 7, 2024

Renovation of a clubhouse / community center in Thornhill, Ontario. Completed plans call for the renovation of a clubhouse / community center.

The City of Markham is soliciting bids from qualified contractors with extensive experience in deep energy and greenhouse gas (GHG) reduction retrofit for the Thornhill Community Centre's Energy & GHG Retrofit project. The contractor must satisfy all the requirement as set by this bid request and perform the work as defined by the project's specifications and drawings in compliance with all the local standards, codes, and best industry practices as applicable. The purpose of this pilot project is to reduce the energy use and GHG emissions for Thornhill CC's by retrofitting the facility with multiple low-carbon measures in a way that optimizes the project budget and cash flow, complies with Infrastructure Canada's Green & Inclusive Community Building (GICB) program requirements, and demonstrates a planned trajectory of achieving net-zero emissions by 2050. This project is in alignment with the City's Municipal Energy Plan (MEP) target of achieving net-zero GHG emissions by 2050. The City has completed the detailed design of the project with MCW Consultants Ltd. & Walter Fedy as detailed in this tender package and per the high-level summary below. This design includes several mechanical, electrical, architectural, and structural systems in the facility that includes; - Boilers B-1 & B2 fuel conversion to heat pump system, - Boilers B-3 & B-4 fuel conversion to heat pump system, - Domestic Hot Water fuel conversion to a hybrid electric water tank heat pump system for the senior building, - Shower Head replacement to low-flow for the facilities change rooms, - Rink Unit Heaters conversion from natural gas to hydronic unit heaters, - Addition of spa covers with R4 insulation during unoccupied times, - Interior Lighting conversion to LED, - Make-Up Unit Replacement and Upgrade with Cooling, - Roof Top Units (11) Conversion Air Source Heat Pumps, - BAS Integration of new system to existing BAS through the City's contractor, - Exterior Doors & Glazing Replacement, and - Infiltration Mitigation in reducing air leakages within the facility. Documents may be obtained at https://markham.bidsandtenders.ca/ Question Deadline: Wed May 1, 2024 12:00 PM (EDT)

Under Construction

Clubhouse / Community Centers

$2,770,149.00

Public - City

Renovation

50

35

13

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
6
Bidding Soon
2,823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

July 24, 2024

Project location map

7755 Bayview Ave, Thornhill, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.