BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Gulfport, Mississippi. Completed plans call for site work for a water / sewer project.

The work consists of, but is not limited to: Furnish all materials, equipment, labor, and supervision and performing all operations necessary for the completion of Mississippi State Port Authority "Hurricane Zeta Timber Piers Repair" project at Gulfport, Mississippi as described in the contract documents. The Contractor shall provide and furnish all tools, equipment, materials, supervision, labor, subsistence, rental, subcontractors, permitting, profit, overhead, appropriate taxes and any other related costs. The Contractor shall provide all materials required, except those specifically indicated as being Owner Furnished by Mississippi State Port Authority at Gulfport. The work includes all that is necessary to provide the Owner with a complete project. Generally, the project includes: Repairs to the North and South timber piers in the commercial harbor and the tugboat pier in the North harbor. Should it appear that the Work to be done, or any matter relative thereto, is not sufficiently detailed or explained in the Contract Documents, the Contractor shall apply in writing to the Engineer for such further explanations as may be necessary for Contractor to accomplish the Work of Improvement, and Contractor shall conform to such explanation or interpretation of the contract by Engineer so far as may be consistent with the intent of the original Plans and Specifications. In the event of doubt or question relative to the true meaning of the Specifications or Plans as explained or interpreted by the Engineer, reference shall be made to the Authority, whose decision thereof shall be final. In the event of any discrepancy between any Plans or Drawing and the figures written thereon, the figures shall be taken as correct. Each Bid must be accompanied by cash, a cashier's check, certified check or Bid Bond in the amount of ten percent (10%) of the total Bid amount. The power of attorney for the bonding company's agent should be on file with the Mississippi State Port Authority or should accompany the Bid, and the Bid Bond must be furnished by a corporate surety company qualified to do business in Mississippi. The Bid Bond shall name the Mississippi State Port Authority as the obligee, shall be substantially in the form of the Bidder's Bond on file with the Mississippi State Port Authority, and shall be payable to the Mississippi State Port Authority in the event the Bidder fails to execute, and deliver to the Mississippi State Port Authority the Contract within fourteen (14) days after the award of the Contract to Bidder Bidder must provide with Bid the name, location and the place of business of each subcontractor who will perform work or labor or render services to the Contractor in or about the construction of the Work of Improvement, or who will specially fabricate and install any portion ofthe Work according to detailed Drawings contained in the Plans and Specifications, in an amount in excess offive percent ofContractor's total Bid. Bidder must provide with Bid the Certification Regarding Debarment, suspension, other responsibility matters and lobbying. Bidder must provide with Bid the portion of the Work which will be done by each subcontractor. Contractor shall list only one subcontractor for each such portion as is defined by Contractor in the Bid. Bidder must provide with Bid a copy of each Subcontractor's Mississippi State certificate ofresponsibility, if Subcontractor is required by law to have one. Bidder must provide with Bid a copy of Contractor's Mississippi State certificate of responsibility. Bidder must provide with Bid a certification letter stating that all new labor hires will be residents of Mississippi. Bidder must provide with Bid a certification letter stating that Bidder will agree to use Mississippi products over non-Mississippi products when all things are equal with respect to price, quality, availability and service. Bidder must provide a Bid Bond with Bid. If Bidder is a non-resident contractor, Bidder must provide with Bid a copy of contractor's current State law pertaining to own State's treatment of non-resident contractors.

Award

Water / Sewer

$185,683.00

Public - Federal

Site Work

9

11

14

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
94
Bidding Soon
1,062
All Active Projects
509
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 27, 2023

August 28, 2023

October 27, 2023

img_map_placeholder

Multiple Locations, Gulfport, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.