BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Concord, New Hampshire. Contact the soliciting agency for additional information.

Supply and installation of water line on Upper Ravine Ski Trail at Cannon Mountain with the State of New Hampshire Water 6" .280W DRL, supply and install, 2800 ft. Shallow bury trench, 250 ft. Clean up and revegetation where trail has been disturbed. Water line coupling supply and install, 36 each Tie into upper valve station manifold Tie bottom into existing pipe on lower part of Ravine All services performed under this Contract(s) shall be performed between the hours of 7:30 A.M. and 4:00 P.M unless other arrangements are made in advance with the State. Any deviation in work hours shall be pre-approved by the Contracting Officer. The State requires ten-day advance knowledge of said work schedules to provide security and access to respective work areas. No premium charges shall be paid for any off-hour work. The Vendor shall not commence work until a conference is held with each agency, at which representatives of the Vendor and the State are present. The conference shall be arranged by the requesting agency (State). The State shall require correction of defective work or damages to any part of a building or its appurtenances when caused by the Vendor's employees, equipment or supplies. The Vendor shall replace in satisfactory condition all defective work and damages rendered thereby or While on State property, employees shall be subject to the control of the State, but under no circumstances shall such persons be deemed to be employees of the State. All personnel shall observe all regulations or special restrictions in effect at the State Agency. The Vendor's personnel shall be allowed only in areas where services are being performed. The use of State telephones is prohibited. If sub-contractors are to be utilized, please include information regarding the proposed sub-contractors including the name of the company, their address, contact person and three references for clients they are currently servicing. Approval by the State must be received prior to a sub-contractor starting any work. any other damages incurred. Upon failure of the Vendor to proceed promptly with the necessary corrections, the State may withhold any amount necessary to correct all defective work or damages from payments to the Vendor. The work staff shall consist of qualified persons completely familiar with the products and equipment they shall use. The Contracting Officer may require the Vendor to dismiss from the work such employees as deems incompetent, careless, insubordinate, or otherwise objectionable, or whose continued employment on the work is deemed to be contrary to the public interest or inconsistent with the best interest of security and the State. The Vendor or their personnel shall not represent themselves as employees or agents of the State. Question Deadline 06/20/2023 8/1/2023 Target Implementation of Contract

Post-Bid

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
96
Bidding Soon
2,088
All Active Projects
855
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2023

July 24, 2023

img_map_placeholder

Multiple Locations, Concord, NH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.