Renovation of a municipal facility in Appleton, Wisconsin. Completed plans call for the renovation of a municipal facility.
Remove and replace (Quantity of 60) FSP-951 smoke detectors Remove and replace (Quantity of 15) FST-951R heat detectors Remove and replace (Quantity of 8) bulk packs of B300-6-BP detector bases Remove and replace (Quantity of 15) NBG-12LX manual pull stations Remove and replace (Quantity of 5) FMM-1 monitor modules Remove and replace (Quantity of 5) FRM-1 relay modules Remove and replace (Quantity of 3) ISO-X Isolation modules 1. Work can be performed during normal business hours Mondays through Fridays excluding County observed holidays. 2. Contractor shall replace devices as they are removed so the system can be re- enabled at the end of each day. All devices shall be installed to manufactures recommendations and specifications. 3. Program fire alarm system as needed to accept and recognize new devices. 4. Contractor shall test each device and the system at the completion of the project to assure all devices are working as required. 5. Existing wiring to devices shall remain. Contractor is not responsible for replacing wiring to devices. 6. Contractor shall take care not to damage surfaces such as walls, ceiling and floors, however contractor will not be responsible for patching and painting of walls and ceilings if needed due to device replacement. 7. Contractor shall be responsible for any permits that are required for this project and all work shall meet all local codes. 8. Provide a one-year labor and materials warranty for project. Pricing shall be lump sum bid for all materials and associated with the replacement of the listed devices. Any questions that come up and require additional information will be posted online at www.outagamie.org then Bids / Proposals. Owner's Right to Stop Work If the contractor fails to correct Work which is not in accordance with the requirements of this RFB or fails to carry out Work in accordance with RFB, the County may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the County to stop Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity. Owner's Right to Carry Out Work If the Contractor defaults or fails or neglects to carry out the Work in accordance with the RFB, or fails to perform a provision of the RFB, the County, after 10 days written notice to the Contractor and without prejudice to any other remedy the County may have, may make good such deficiencies and may deduct the reasonable cost thereof. Including County's expenses and compensation for the Architect's services made necessary thereby, from the payment then or thereafter due the Contractor. A PO will be issued by end of day July 14, 2023. Project shall be substantially completed by 3pm December 8, 2023. Failure to achieve substantial completion by December 8th will result in a $50 per calendar day liquidated damages penalty. Any questions that come up and require additional information will be posted online
Award
Municipal
$15,515.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2023
August 10, 2023
320 S Walnut St, Appleton, WI
Related To This Project
Appleton, WI
--
Appleton, WI
Bid Date: Jul 11 2023
Appleton, WI
Bid Date: Jul 12 2023
Appleton, WI
Bid Date: Jul 17 2023
Appleton, WI
Bid Date: Jun 29 2023
Appleton, WI
Bid Date: Jul 26 2023
Appleton, WI
Bid Date: Nov 05 2021
Appleton, WI
Bid Date: Jun 30 2023
Appleton, WI
Bid Date: Jul 06 2023
Appleton, WI
Bid Date: Jun 23 2023
Appleton, WI
Bid Date: Mar 19 2024
Appleton, WI
--
Appleton, WI
Bid Date: Jun 12 2023
Appleton, WI
Bid Date: Aug 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.