Published July 10, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Springfield, Oregon. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Springfield Utility Board (SUB) seeks a contractor to excavate and remove existing asphalt, cold mix, concrete, rock and restore with new asphalt and concrete to the attached Contract Documents. The total approximate quantities are provided in the Price Proposal section. The successful bidding contractor is responsible for asphalt/cold mix/concrete/rock removal, compaction, asphalt base liftsb and testing, asphalt top lift and testing, pavement milling removal, ADA ramp replacement, curb & gutter replacement, sidewalk replacement, concrete valve box collars, pavement markings, polymerized crack sealing the joints, saw-cutting and all traffic control. Pavement Restoration for 58th Street, Aster to A Streets must be completed 30 calendar days from SUB and contractors agreed upon start date. Contractor will agree to pay $500 per calendar day, not as a penalty, but as liquidated damages in case of failure to meet contracted completion dates. Payment by the Contractor of liquidated damages does not release the Contractor from its obligation to fully and timely perform the contract according to its terms and conditions. For any technical questions regarding this bid please call Ladd Boyce at 541-501-0749 or email at LaddB@subutil.com. With any bid submittal related questions email Rebecca Wheeler at RebeccaW@subutil.com. Springfield Utility Board reserves the right to reject any or all bids, to waive minor irregularities not affecting substantial rights, and to accept such bids that in the opinion of the Board are in the best interest of Springfield Utility Board. Acceptance of bids and award of contract will follow procedures provided by ORS 279C and be in accordance with applicable SUB policies. Pending Board approval, official bid awarded on July 12. Work estimated to begin August 13. Completion date 30 calendar days from SUB & Contractor's agreed upon start date.

Award

Sidewalks / Parking Lot

$364,395.00

Public - City

Paving, Site Work

9

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
0
Bidding Soon
200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

August 13, 2023

Project location map

Multiple Locations, Springfield, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.