BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marshalltown, Iowa. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Furnishing all labor, equipment, and materials to implement the Water Metering Equipment Changeout 2023 project, which consists of: 1. Furnishing and installing an Automated Mobile Reading (AMR) system that is capable of being installed as a mobile system and later migrating to fixed network. The selected network shall utilize a fully two-way Mobile Transceiver to read and communicate/transmit to metering devices and include all software required to interface with Owner's billing system. 2. Furnishing radio transmitters for the complete inventory of Owner's water meters (10,484 in total with sizes ranging from 5/8" x 3/4" to 10" diameter as shown in the Bid Form). 3. Furnishing new water meters equipped with encoder registers, including installation of approximately 35 meters in locations to be selected by Owner for training purposes. 4. Furnishing new water meters to replace the Owner's entire inventory (10,484 in total with sizes ranging from 5/8" x 3/4" to 10" diameter as shown in the Bid Form) over the duration of the contract as project budget allows. 5. Additional water meter installations may be approved following the successful implementation of the proposed AMR system, or as needed to ensure compatibility with the proposed manufacturer's meter reading system. 6. All other work as required by the contract documents. Work on the improvement shall commence within 30 days after the Effective Date of the Contract, or on the day indicated in the Notice to Proceed. The Notice to Proceed will be issued upon approval of the contract and bonds by the City Council and be completed as stated below. The work shall be substantially completed on or before May 31, 2027, and the work shall be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before June 30, 2027. Failure to meet either the Substantial Completion date or Final Completion date will result in liquidated damages of $500.00 per calendar day A pre-bid conference for the Project will not be held

Bid Results

Water / Sewer

$1,269,078.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
44
Bidding Soon
654
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

August 10, 2023

img_map_placeholder

Multiple Locations, Marshalltown, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.