Renovation of an educational facility in Wellsville, New York. Completed plans call for the renovation of a educational facility.

The scope of work for this project includes upgrades to classroom unit ventilators, ventilation and classroom VRF systems The Wellsville CSD Invites Bids for General Construction, Mechanical, and Electrical Work for the 2021 Arp Project Project. The Project is Located at 126 West State Street, Wellsville, New York - 14895. Project cost range is anticipated to be under $2,000,000.00 Bids will be received for the following Work: 1. Multiple Contract Project consisting of the following prime contracts: a. General Construction. b. Mechanical Construction. c. Electrical Construction. Bid security shall be submitted with each bid in the amount of [5%] five percent of the bid amount. No bids may be withdrawn for a period of [45] forty-five days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. All project related questions can be directed to Ryne Wight at rwight@cplteam.com, or by phone at (716)701-7006. All questions regarding obtaining bid documents shall be directed to April Harvey at aharvey@cplteam.com, or by phone at (716)701-7009 Successful bidder shall begin the Work upon receipt of the Notice to Proceed and shall complete the Work within the Contract Time. Attention of the Bidder is particularly called to the Owners sales tax exemption, the requirements as to conditions of employment to be observed and the minimum wage rates to be paid under the contract. In addition, the Bidding Documents for this project contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements, bank references, lists of lawsuits, arbitrations or other proceedings in which the Bidder has been named as a party, a statement of suretys intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder. Bidders will comply with New York State prevailing wage and supplement requirements which must be complied with on the Project. The Wellsville CSD hereby reserves the right to waive any informalities and reject any, or all, Bids or to accept the one that, in its judgement, will be in the best interest of Wellsville CSD All questions regarding obtaining bid documents shall be directed to April Harvey at aharvey@cplteam.com, or by phone at (716)701-7009

Bid Results

Educational

$75,000.00

Public - City

Renovation

32

17

4

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning, General Commissioning Requirements
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Roof Windows and Skylights, Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lightning Protection for Structures, Lighting, Special Purpose Lighting, Security Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Trenching, Fill, Backfill, Trenching and Backfilling, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
62
Bidding Soon
1,099
All Active Projects
441
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2023

September 18, 2023

img_map_placeholder

126 W State St, Wellsville, NY


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2021 ARP Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.