BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Arroyo Grande, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

In general, the project consists of the removal of existing and installation of new paver bands in sidewalks, paver crosswalks, curb ramps, curb, gutter, and sidewalk, the installation of exposed aggregate concrete sidewalks, removal and replacement of lifted and/or broken sidewalks, and curb/gutter sections. The project estimated construction cost for the Base Bid is $375,000. Contract time is established as 50 working days. Each bid must be accompanied by either a: 1. certified check 2. cashier's check 3. bidder's bond Contractor shall forthwith furnish in triplicate, a faithful performance bond in an amount equal to 100% of the contract price and a labor and materials bond in an amount equal to 100% made payable to the City of Arroyo Grande for an amount equal to ten percent of the bid amount as a guaranty. Guaranty will be forfeited to the City Arroyo Grande if the bidder, to whom the contract is awarded, fails to enter into the contract. The City of Arroyo Grande reserves the right to accept or reject any or all bids or waive any informality in a bid. All bids are to be compared on the basis of the Public Works Director's estimate of the quantities of work to be done, as shown on the Bid Item List The City will consider additional documentation or other supporting information regarding the protest if submitted in compliance with the specified time limits. Anything submitted after the specified time limit will be rejected and not be considered. The Director of Public Works or Designee may request additional information to be submitted within three days of the request, unless otherwise specified, and will notify the protester of the ruling within ten days of the determination. Pursuant to the Public Records Act (Government Code, 6250, et seq.), the City will make public records available upon request.

Award

Sidewalks / Parking Lot

$520,538.00

Public - City

Paving, Site Work

8

4

4

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
15
Bidding Soon
234
All Active Projects
100
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2023

August 17, 2023

img_map_placeholder

Multiple Locations, Arroyo Grande, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.