BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.

The Smythe-Bandola Mitigation Project consists of enhancement and rehabilitation of riparian resources located along the Tijuana River, within the City of San Diego (City), California, immediately south of the Tijuana River Pilot channel. Enhancement and rehabilitation shall be conducted within the designated restoration project area and weed free buffer, with staging and removed material stockpiling conducted in locations identified on the Construction Documents. The work schedule is defined by an installation phase and a postconstruction 120-day plant establishment maintenance period (Project contract period). Contractor services required of this scope of work include a pre-project survey of the restoration project boundary and weed free buffer, install and maintain perimeter T-post and rope fencing along the restoration project boundary, install and maintain T-post fencing along the outer weed free buffer boundary, cut to grade and remove all exotic and all diseased native vegetation from restoration project area and weed free buffer (per shot-hole borer best practices), treat and stockpile all vegetation removed from the restoration project area and weed free buffer at the project staging areas (per shot - hole borer best practices), remove and dispose of trash and inorganic debris from the restoration project area, conduct regular weed control from the restoration project area and weed free buffer for the duration of the contract period, install native container plants in rehabilitation areas, hand water container plants at installation and through the contract period, conduct 120-day maintenance period (upon completion of installation), and dispose of stockpiled vegetation following completion of 120-day maintenance period (or as directed by City). As an option, the contractor may choose to install an irrigation system to facilitate plant establishment. The Contractor shall also be required to develop a Water Pollution Control Plan (WPCP) and install and maintain erosion control best management practices (BMPs) per the requirements of the WPCP. Additional services required from this scope of work includes proving a qualified biological monitor and cultural monitor for the duration of the Project contract period. Biological services shall include monitoring and reporting and assuring compliance with Project avoidance and minimization measures. Cultural monitoring shall include development of Cultural Resources and Treatment Plan (CRTP) and monitoring, as required by the CRTP. 1.1. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 0100929-01-D through 0100929-06-D, inclusive. Contractor's certification of pending actions (required) Mandatory disclosure of business interests form (required) Debarment and suspension certification for prime contractor (required) Debarment and suspension certification for subcontractors, suppliers and manufacturers (required). Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Total voluntary subcontractor participation percentage for this project is 10%. ESTIMATED CONSTRUCTION COST: The Citys estimated construction cost for this project is $804,000.

Bid Results

Water / Sewer

$935,667.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
39
Bidding Soon
729
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2023

August 18, 2023

img_map_placeholder

Multiple Locations, San Diego, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.