BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2023 at 8:00 PM

Updated March 8, 2025

Site work, new construction and renovation of an educational facility in St Louis Park, Minnesota. Completed plans call for the construction of a 11,386-square-foot educational facility; for site work for a two-story above grade educational facility; and for the renovation of a 14,057-square-foot educational facility.

The Minnesota St. Louis Park City Council has approved a conditional use permit (CUP) for the construction of a data center at 6400 Walker Street during a meeting on September 5. St Louis Park school district data center – ParkTV St. Louis Park The project will see a data center built to the southeast of a football field and next to an existing maintenance building. From the floor plans provided with the application, the data center will cover around 5,850 sq ft (543 sqm) of floor space and will feature office space, storage rooms, a dedicated repairs section, and a mechanical/electrical room. The project is expected to start in the fall or early winter, 2023, and to take 16 months to complete. The City Council received a report from Jacqueline Kramer, associate planner with the city of St. Louis Park, on the proposed data center. According to Kramer, the land suggested for the data center is currently an outdoor storage yard, mostly for gravel. Once constructed and operational, the data center will have approximately 12 members of staff, half of which will be off-site at any given time. Other site changes will include a new underground stormwater treatment system, new plantings and landscaping, and a new playground to the northeast of the building. At the end of Kramer's report, the request was approved unanimously by council members. In May 2023, a Pennsylvania high school received a $2.6m overhaul including a new data center for the district. In August of the same year, North Carolina's Brunswick County approved two containerized data centers for schools in the county, provided by Schneider Electric. The project consists of construction of a new two-story district data center adjacent to the existing maintenance building. The scope includes partial renovation of the maintenance building, consisting of upgrades to mechanical, plumbing, and electrical systems, tuckpointing and repairs of exterior masonry veneer, and replacement of most exterior doors. Sitework includes landscaping, irrigation system, concrete curb and sidewalks, and bituminous pavement.

Post-Bid

Educational

$5,000,000.00

Public - City

New Construction, Renovation, Site Work

97

31

58

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
125
Bidding Soon
1,550
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

September 25, 2023

Project location map

6400 Walker St, St Louis Park, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.