EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a mixed-use development in Concord, North Carolina. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for the demolition of a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project consists of the demolition of existing site structures and construction of the new J.E. Jim Ramseur Park, including, but not limited to, sitework, Cox Mill roadway improvements, park amenities, greenway, shelters, pickleball restroom building, splashpad pavilion/restroom building, basketball restroom building, and a maintenance building. The project includes sitework and vertical construction on the neighboring school property through agreement with the City. Technical questions: Contact Noah Shaver, (shavertn@concordnc.gov) Take I-77 north to I-85 north from Charlotte to Concord From I-85 north, take exit 49 to the right towards Lowe's Motor Speedway At the Lowe's Motor Speedway, turn left onto Highway 29 (Concord Pkwy) north Keep going north while you pass the Wal-Mart shopping center on your right Turn right at the light at the Chevrolet dealership onto CabarrusAvenue Turn right at the next traffic light at the Walgreens onto Hwy 601 South (bypass) (Hwy 601 S is also Warren C. Coleman Boulevard) Go straight through two traffic lights at Old Charlotte Road and Wilshire Avenue Pass the Golf Driving Range on your right Turn right at the next traffic light at Manor Avenue (red & white sign on right for the City of Concord Alfred M. Brown Operations Center) You will be on the entrance road into our complex Follow signs to the left to Visitor Parking. Proceed to the front desk at the Administration Building and sign in with the Receptionist Each Proposal must be accompanied by a deposit equal to 5% of the net price bid. This deposit may consist of cash, or a Cashier's Check issued by, or a Certified Check drawn on a Bank or Trust Company authorized to do business in North Carolina, or on a Bank insured by the Federal Deposit Insurance Corporation, or a U.S. Money Order, payable to the City of Concord or 5% Bid Bond The performance bond shall have a value equal to 100% of this Contract. The payment bond shall be in an amount equal to 100% of the Contract, and conditioned upon the prompt payment for all labor or materials for which a contractor or subcontractor is liable. The undersigned further agrees to begin work within ten (10) days after a Notice to Proceed with an adequate work force, carry the work forward as rapidly as possible and complete the work within 730 calendar days. Owner reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids, and will award to lowest responsible Bidder taking into consideration quality, performance, and time specified in Bid Form for performance of Work. Owner also reserves the right to waive informalities.

GC Bidding

Playgrounds / Parks / Athletic Fields

$35,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

237

25

2

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
73
Bidding Soon
1,078
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

May 19, 2025

img_map_placeholder

1252 Cox Mill Rd, Concord, NC

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.