BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Palmetto Bay, Florida. Completed plans call for the renovation of a educational facility.

Project Scope Of Entails Miscellaneous Finishes, Lighting and Equipment Replacement, Selective Interior Painting, Selective Toilet/Dressing Rooms Improvements And Electrical Upgrades. Request for Information (RFIs) shall be submitted in writing to hb@legocc.com on or before June 28, 2023 @3:00 PM. LEGO Construction Company is the selected Construction Manager for MDCPS Project SOUTHWOOD MIDDLE SCHOOL which carries SBE/MBE 6.33%, MWB/E (African American, Asian American & Native American firms) - 18.67% & local workforce utilization 20% county wide radius. PREVAILING WAGES: There are NO PREVAILING WAGES applicable for this project. The Work of this Contract comprises the GOB Funded Building No. 1 Renovations at Southwood Middle School located at 16301 S.W. 80 th. Avenue, Palmetto Bay, Florida 33157. Scope of Work includes, but not necessarily limited to the following: 1. Selective Demolition and Removal of Portions of Existing improvements. 2. Replacement/Upgrades to Auditorium sound (audio/visual) system. 3. Replacement/Upgrades to Auditorium Stage lighting system and control panel. 4. Replacement of electrical florescent and "high-hat" Auditorium house lighting. 5. Replacement and/or addition of electrical Auditorium special purpose/courtesy (step) lighting. 6. Replacement / upgrade to Auditorium Epoxy flooring. 7. Replacement / upgrade to Auditorium acoustical wall panels/treatment. 8. Replacement / upgrade to Auditorium Stage curtains and riggings. 9. Replacement / upgrades Dressing Areas and Toilet Room plumbing fixtures, finishes, lighting, ceiling and millwork cabinets. 10. Miscellaneous improvements/upgrades to Auditorium electrical system, wiring and panelboards. 11. Repair and/or Replacement of existing Auditorium Stage flooring. 12. Replacement Of Suspended Acoustical Ceiling Tiles & Aluminum Grid System, Lay-In Light Fixtures, And Miscellaneous Floor Finishes. 13. Incidental Interior Painting 14. Incidental Cutting, Patching and Repair Work. 15. Other miscellaneous incidental work as indicated in the Contract Documents. The General Scope of Work Involves the GOB Funded Renovation Of An Existing Public Educational Facility, Specifically "Southwood" Middle School Building 01 Auditorium Renovations; Project Scope Of Entails Miscellaneous Finishes, Lighting and Equipment Replacement, Selective Interior Painting, Selective Toilet/Dressing Rooms Improvements And Electrical Upgrades which includes, but not necessary limited to, the following: 1. Acoustical Ceiling Tile and Grid Replacement. 2. Replacement / Upgrade To Existing Auditorium Aisles V.C.T. Flooring (DA-1) 3. Repair/Renovation of Auditorium Stage Flooring (DA-2). 4. Replacement / Upgrade to Auditorium Sound System & Control Panel. 5. Replacement / Upgrade to Auditorium Stage Lighting and Control Panels. 6. Replacement of Florescent and Hi-Hat Auditorium House Lighting. 7. Addition of Auditorium New Special Purpose / Courtesy (Step) Lighting. 8. Incidental Auditorium Interior Painting, Cutting And Patching of Surfaces Work. 9. Miscellaneous Replacement / Upgrade to Auditorium Electrical System, Panelboards and Wiring. 10. Replacement / Upgrade to Auditorium Acoustical Wall Panels / Treatment (DA-4). 11. Replacement / Upgrade to Auditorium Stage Curtains and Riggings. 12. Replacement / Upgrade to Auditorium Epoxy Flooring (DA-3). 13. Dressing Areas and Toilet Room Finishes, Lighting, Exhaust Fan Grilles & Millwork Replacement / Upgrades (DA-5)

Post-Bid

Educational

$10,000,000.00

Public - County

Renovation

33

16

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
38
Bidding Soon
980
All Active Projects
438
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2023

September 12, 2023

img_map_placeholder

16301 SW 80th Ave, Palmetto Bay, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.